Availability
Knock Sensor, Original Equipment, Each
Part Number: DFP-AS10167
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Suspension Ball Joint
Part Number: DFP-TC1626
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Ignition Coil Pack, OEM Replacement, Chrysler, Dodge, Jeep, Ram, 4.7L, Each
Part Number: DFP-GN10458
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Sensor, Engine Coolant Temperature, Chrysler, Dodge, Eagle, Jeep, Mitsubishi, Plymouth, Each
Part Number: DFP-TS10175
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Fuel Pump, Electric, In-Tank, Kit
Part Number: DFP-FG0237
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Ignition Coils, Coil Pack Style, Black, Chrysler, Dodge, Jeep, Ram, V6, Each
Part Number: DFP-GN10616
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
FUEL LIFT PUMP
Part Number: DFP-HFP274
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.860 in. Length, Mopar Hemi V8, 426, 7.0L, Set of 8
Part Number: SCA-66860
Not Yet Reviewed
Estimated Ship Date: Nov 13, 2025 if ordered today
Estimated Ship Date: Nov 13, 2025 if ordered today
Idle Air Control Valve, OE Replacement, Dodge, Jeep, Each
Part Number: DFP-CV10153
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Pistons, Forged, 4.350 in. Bore, 3.750 in. Stroke, Flat Top, 6.760 in. Rod Length, 1.094 in. Pin Diameter, BBC, Chrysler, Set of 8
Part Number: PIS-1000563
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Tailpipe, Exhaust, Outside Diameter 2.500 in., Stainless Steel, Natural, Chrysler, Dodge, Each
Part Number: WLK-55591
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.760 in. Length, Mopar V8, 440, 7.2L, Set of 8
Part Number: SCA-6676099
Not Yet Reviewed
Estimated Ship Date: Nov 13, 2025 if ordered today
Estimated Ship Date: Nov 13, 2025 if ordered today
Suspension Control Arm Bushing Kit, Suspension Control Arm Bushing Kit
Part Number: DFP-TD4833W
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.123 in. Length, Mopar, Small Block, 5.9L, Set of 8
Part Number: SCA-66123
Not Yet Reviewed
Estimated Ship Date: Nov 13, 2025 if ordered today
Estimated Ship Date: Nov 13, 2025 if ordered today
Sway Bar End Link, OE, Replacement, Rubber, Black, Each
Part Number: DFP-TD626W
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Sway Bar End Link, OE, Replacement, Each
Part Number: DFP-TC5617
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Suspension Ball Joint
Part Number: DFP-TC1656
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Fuel Pumps, Fuel Pump Module Assemblies, Electric In-tank, 12 V, Stock psi, Sending Unit, Dodge, Kit
Part Number: DFP-FG0372
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Idle Air Control Valve, OE Replacement, Dodge, Each
Part Number: DFP-CV10159
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
CTRL ARM & BALL JOINT ASSEMBLY
Part Number: DFP-TC2504
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Suspension Ball Joint Front Lower Rearward
Part Number: DFP-TC5042
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Resonator, Stainless Steel, Natural, Passenger Side, Dodge, Jeep, Each
Part Number: WLK-52498
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Ignition Coil, Coil Pack Style, Socket, Rectangular, Black, Chrysler, Dodge, 5.7L Hemi, Each
Part Number: DFP-GN10372
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
ENGINE CRANKSHAFT POSITION SENSOR
Part Number: DFP-SS10127
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
ENGINE CRANKSHAFT POSITION SENSOR
Part Number: DFP-SS10178
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.