Availability
Piston Rings, Moly, 4.000 in. Bore, 1.5mm, 1.5mm, 4.0mm Thickness, 8-Cylinder, Set
Part Number: SLP-E-908K
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Rod Bearings, XP-Series, Copper/Lead/Nickel, Standard Size, Chrysler, Dodge, Jeep, Plymouth, Set of 8
Part Number: KGB-CR805XPN
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pushrods, Assembled, 5/16 in., Steel, Ball/Ball, 8.085 in. Length, Chrysler, Dodge, Jeep, Each
Part Number: MEL-MPR-668
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pressure Plate Fasteners, 12-point Head, Steel, Black Oxide, 10mm x 1.5mm x 25mm, Chevrolet LS, Ford Modular, Set of 6
Part Number: MCL-1505
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Oil Pan, Dodge Cummins, Steel, Each
Part Number: RNB-264-059
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Claimer Series Performance Piston Ring Sets, Plasma-moly, 4.030 in. Bore, 1/16 in., 1/16 in., 1/8 in. Thickness, L8, V8, Set of 8
Part Number: HSN-CM5521030
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Installation Kit, Harmonic Balancer, 8740 Chromoly, Black Oxide, Up To 700HP/1,250 lb-ft Torque, Cummins, Kit
Part Number: FLU-300007
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pushrods, Assembled, 5/16 in., Steel, Ball/Ball, 6.792 in. Length, Chrysler, Dodge, Jeep, Each
Part Number: MEL-MPR-667
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pistons, Hypereutectic, Dome, Bore, Chrysler, Jeep, 5.7L, Set of 8
Part Number: SLP-H899CPA
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Harmonic Balancer, OEM Replacement, Dodge, Jeep, 5.9L, Each
Part Number: PBB-PB1186N
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Rod Bearings, XP-Series, Copper/Lead/Nickel, Standard Size, Chrysler, Dodge, Jeep, Plymouth, Set of 8
Part Number: KGB-CR805XPNSTDX
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Springs, Retainers, Single Springs, Chromoly Steel Retainers, Dodge, Ram, 5.9L, 6.7L, Kit
Part Number: FLE-FPE-34797
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam Bearings, Bi-metal Aluminum, Chrysler, Dodge, Ram, Set
Part Number: SLP-1935M
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Set, Premium Billet, Double Roller, Steel Sprockets, Mopar Small Block, .005 in.Shorter Centerline Dist.
Part Number: CLO-9-3603X9-5
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Oil Pump, Stock Replacement Oil Pump
Part Number: MEL-M451
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pan, Stock, Steel, Black Painted, Jeep, Grand Cherokee, Dodge, Ram, Van, 5.2L, Each
Part Number: RNB-264-231
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Filter, Canister, 3/4-16 in. Thread, 3.740 in. High, Each
Part Number: SUM-127006
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Harmonic Balancer, OEM Replacement, Chrysler, Dodge, Plymouth, 318, 340, 360, Each
Part Number: PBB-PB1004N
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Filter, Fram Racing, 3/4 in.-16 Thread, Each
Part Number: FRM-HP3
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Harmonic Balancer, Internal Balance, Nodular Iron, Natural, Chrysler/Dodge/Plymouth, Small Block/V6, Each
Part Number: RNB-594-021
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pistons, Hypereutectic, Dish, 4.030 in. Bore, for 3.580 in. Stroke/6.123 in. Rods, 1.612 in. CH, Press Fit 0.984 in. Wrist Pins, Dodge, Set of 8
Part Number: SLP-H655CP75MM
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Original Premium Piston Ring Sets, Plasma-moly, 3.917 in. Bore, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: MAH-41904CP
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Rod Bearings, XP-Series, Copper/Lead/Nickel, 0.010 Crankshaft Undersize, Chrysler, Dodge, Jeep, Plymouth, Set of 8
Part Number: KGB-CR805XPN010
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pushrod, OEM Replacement, 5/16 in. Diameter, 6.831 in. Length, Ball/Ball Ends, Each
Part Number: MEL-MPR-462
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.