Availability
Estimated Ship Date: Monday 9/8/2025
Idler Pulley, Serpentine, Steel, Black, Each
Part Number: RNB-419-610
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pushrod, Assembled, Steel, 5/16 in. Diameter, Ball Tips, 6.936 in. Length, Must Be Used with 292326-16 Lifters, Chrysler, Dodge, Jeep, Ram, Each
Part Number: MEL-MPR-667-A
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arms, Pedestal-Shaft Style, Steel, Standard Ratio, Bronze Bushed, Dodge/Cummins, 12V, Kit
Part Number: PQX-3235921
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Pistons, Hypereutectic, Dish, 4.000 in. Bore, 1.5mm, 1.5mm, 4.0mm Ring Grooves, Mopar, Set of 8
Part Number: UEM-3222HC-STD
Not Yet Reviewed
Estimated Ship Date: Oct 10, 2025 if ordered today
Estimated Ship Date: Oct 10, 2025 if ordered today
Cylinder Head, Performer RPM, Aluminum, Assembled, 58cc, 176cc Intake Runner, Dodge, Jeep, 5.2, 5.9L, Each
Part Number: EDL-61779
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Rod Bearings, .020 in. Crankshaft Undersize, Bi-metal, Silicon Aluminum, Mopar, Set of 8
Part Number: KGB-CR805SI020
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pistons, Dome, Hypereutectic, With Rings, Dodge, Chrysler, HEMI 5.7L, Set of 8
Part Number: MAH-2243731WR025
Not Yet Reviewed
Estimated Ship Date: Oct 9, 2025 if ordered today
Estimated Ship Date: Oct 9, 2025 if ordered today
Lifter Guides, OE Replacement, Composite, Chrysler, Dodge, Jeep, Gen III Hemi, Each
Part Number: MOP-53021721AA
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Heads, Remanufactured, Assembled, Cast Iron, Natural, Dodge, 5.2L, Each
Part Number: VRE-2D58
Estimated Ship Date: Oct 13, 2025 if ordered today
Estimated Ship Date: Oct 13, 2025 if ordered today
Automatic Belt Tensioner, Smooth Pulley, Serpentine, Dodge, Ram, Truck, Each
Part Number: RNB-419-039
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Cover Breather, Crankcase, Stock Replacement, Black, Plastic, Bolt On, Dodge, Truck, Each
Part Number: CBM-05093067AA
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pistons, Dome, Hypereutectic, With Rings, Dodge, Chrysler, HEMI 5.7L, Set of 8
Part Number: MAH-2243731WR050
Not Yet Reviewed
Estimated Ship Date: Oct 9, 2025 if ordered today
Estimated Ship Date: Oct 9, 2025 if ordered today
Piston, OE Replacement, Cast Aluminum, Dome, 3.917 in. Bore, Mopar, Each
Part Number: MAH-S2243449
Not Yet Reviewed
Estimated Ship Date: Oct 10, 2025 if ordered today
Estimated Ship Date: Oct 10, 2025 if ordered today
Oil Drain Pan Plugs, Plug, Thread Size 1/2-20 in., Each
Part Number: RNB-69012
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
USE MHG GS33794
Part Number: FEL-ES72596
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Thrust Washer Bearings, Steel Backed Babbitt, Bronze, Aluminum, Standard Size, Chrysler, Dodge, Jeep, Set
Part Number: SLP-4961F
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Nodular Iron, Black Powdercoated, Internal Engine Balance, Dodge, Jeep, Each
Part Number: CWA-53020229
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting rod bearing set, Chrysler V8, 5.7L, 6.1L, 6.4L Hemi (o/s housing +.002")
Part Number: KGB-CR8048SM
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Oct 3, 2025 if ordered today
Belt, OE Technology Series, Multi-V, Serpentine, 8-Rib, 126.10 in. Length, Each
Part Number: CEL-4081261
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
SERPENTINE BELT KIT, DAYCO
Part Number: DAC-5081265K1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, 4.040 in. Bore, Cast Iron, 3mm., 2.38mm, 4mm, Thickness, Single Cylinder, Set
Part Number: MAH-S42170020
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Belt, OE Technology Series, Multi-V, Serpentine, 7-Rib, 101.25 in. Length, Each
Part Number: CEL-4071013
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Monday 9/8/2025
Oil Pump, Standard Volume, Standard Pressure, Dodge, Each
Part Number: MEL-M251
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.