Availability
Cylinder Heads, Remanufactured, Assembled, Cast Iron, Natural, Dodge, 5.2L, Each
Part Number: VRE-2D58
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
Clutch Kit - Stage 1 Single Sprung Organic Clutch Disc
Part Number: XCL-XKJE26001-1A
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Alternator, 165 Amp, Chrome, 1-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-38529-116
Estimated Ship Date: Today
Estimated Ship Date: Today
Distributor, Ready To Run, Magnetic Pickup, Vacuum Advance, Fixed Collar, Chrysler LA, Kit
Part Number: EDL-22761
Not Yet Reviewed
Estimated Ship Date: Nov 26, 2025 if ordered today
Estimated Ship Date: Nov 26, 2025 if ordered today
Alternator, 220 Amp, Black Powdercoated, 2-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-58539
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Differential Cover, Rear, 12-bolt, Aluminum, Natural, Chrysler 9.25 in., Each
Part Number: BMM-10306
Estimated Ship Date: Today
Estimated Ship Date: Today
Alternator, 165 Amp, Black Powdercoated, 6-Groove Serpentine Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-58529-103
Estimated Ship Date: Today
Estimated Ship Date: Today
Battery, 12 V, Deep Cycle/Starting, 1,300 Cranking Amps at 32 Degrees F, 12.09 in. Length, 6.65 in. Width, 8.31 in. Height
Part Number: XSP-D2700
Cannot be shipped Internationally
Cannot be shipped Internationally
Computer Chip/Module, Stage 1, Dodge, Jeep, Each
Part Number: JET-90002
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Ring and Pinion Gear Installation Kit, Master Overhaul, 29 Spline, Chrysler 9.25 in., Kit
Part Number: YGA-14012
Estimated Ship Date: Today
Estimated Ship Date: Today
Flywheels, OE Replacement, Ductile Iron, 130-tooth, 32 lbs., Dodge, Each
Part Number: PFT-50-3409
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Timing Cover, One-piece, Aluminum, Natural, Gaskets, Dodge, Jeep, Kit
Part Number: RNB-635-401
Estimated Ship Date: Today
Estimated Ship Date: Today
Differential, Lock-Right, Locker, 27-Spline, Mopar, 8.25 in., Each
Part Number: PWT-1230-LR
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Ignition Coil, Blaster, Epoxy, Black, Chrysler, Dodge, Jeep, Set of 6
Part Number: MSD-827263
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Fender Flare, Synthetic Rubber, Black, 4.25 in. Flare Width, 1/4 in. Thick, 25 ft. Length Roll, Each
Part Number: PPP-52-178
Estimated Ship Date: Today
Estimated Ship Date: Today
Throttle Response Enhancer, REACT Performance, Each
Part Number: HYP-101300
Estimated Ship Date: Nov 14, 2025 if ordered today
Estimated Ship Date: Nov 14, 2025 if ordered today
 
            
    
    
    Mail - In Rebate
Rebate amount based on part(s) total.
Rebate Expires: 12/31/2025
Catalytic Converter, California Grade, Universal, Stainless Steel Case, 16.000 in. Overall Length, 3.000 in. Inlet/Outlet, Each
Part Number: MPE-339109
Estimated Ship Date: Today
Mail - In Rebate
Rebate amount based on part(s) total.
Rebate Expires: 12/31/2025
Estimated Ship Date: Today
Alternator, 220 Amp, Polished, 1-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-68539-116
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Light Bulbs, Nitro-Lux, LED, 9007/HB5, White, 6500K, Pair
Part Number: PUT-709007
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Shocks and Struts, Stocker Star Shocks, Stock Ride Height, Monotube, Adjustable Valving, Rear, Dodge, Each
Part Number: QA1-TD806
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Alternator, 165 Amp, Polished, 2-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-68529
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Bumper, Surestep, Steel, Chrome, Chevy, GMC, Rear, Each
Part Number: FEY-21002
Estimated Ship Date: Today
Estimated Ship Date: Today
Drum Brake Kit, Autospecialty, OE Replacement, Semi-Metallic Shoes, Iron Drums, Hardware Included, Rear, Dodge, Mitsubishi, RAM, Kit
Part Number: PWR-KOE15405DK
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Brake Rotors/Pads, Cross-Drilled/Slotted, Iron, Zinc Dichromate Plated, Rear, Dodge, Kit
Part Number: PWR-K2192
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Cylinder Heads, Remanufactured, Assembled, Aluminum, Natural, Dodge, Jeep, Mitsubishi, 4.7L, Each
Part Number: VRE-2D93
Not Yet Reviewed
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.