Availability
Timing Chain and Gears, True Roller, Double Roller, Steel Sprockets, Chrysler, Dodge, Plymouth, Set
Part Number: SUM-G6603R-9
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Mopar, Small Block, Set
Part Number: SUM-G6603R-B
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ignition Tune-Up Kit, Dodge, Jeep, Truck, Van, SUV, 5.2, 5.9L V8, Kit
Part Number: SUM-867815CR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Water Pump, Mechanical, High-Volume, Aluminum, Natural, Chrysler, 239/318/340/360, Each
Part Number: SUM-311021
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Street/Strip, 8.5mm, Black, Straight Boots, Mopar, Small Block LA, Set
Part Number: SUM-888900
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cap Rotor Wire Kit, 8mm, Points Ignition, Dodge, Chrysler, Plymouth, Small Block, Kit
Part Number: SUM-867807CR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oxygen Sensor Extension Harnesses, 4-wire, 4 Square Female Plug Style, 12 in. Length, Dodge, Pair
Part Number: SUM-890169
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ignition Tune-Up Kit, Dodge, Dakota, 3.9L V6, Kit
Part Number: SUM-867624CR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Street/Strip, 8.5mm, Black, Straight Boots, Mopar, Small Block Magnum, V8, Set
Part Number: SUM-887815
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Headlight Assembly LH 8/97-04 DAKOTA 98-03 DURANGO INNERCL PARK/SIGNAL CH2502122 Each
Part Number: SUM-CS056-B101L
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Headlight Assembly RH 8/97-04 DAKOTA 98-03 DURANGO INNERCL PARK/SIGNAL CH2503122 Each
Part Number: SUM-CS056-B101R
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Suspension Lift, Leveling, Front, Steel Spacers, Dodge, Ram, Kit
Part Number: SUM-G792
Estimated Ship Date: Sep 3, 2025 if ordered today
Estimated Ship Date: Sep 3, 2025 if ordered today
Brake Rotor, Extreme Performance, Vented, Cross-Drilled/Slotted, 11.30 in. Diameter, Iron, Zinc plated, Each
Part Number: SUM-BR-67038RC
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Headlight Assembly RH 91-96DAKOTA W/AERO CH2503105 Each
Part Number: SUM-CS076-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.