Filters
Lifters, Hydraulic Roller, Chrysler, Dodge, Jeep, Ram, 5.7L, 6.4L, with MDS, Front, Set of 4
Part Number: SLP-HT2311K
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K30
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Lifters, Hydraulic Roller, Chrysler, Dodge, Jeep, Ram, 5.7L, 6.4L, with MDS, Rear. Set of 4
Part Number: SLP-HT2312K
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Lifters, Hydraulic Roller, Chrysler, Dodge, Jeep, Ram, Hemi, Set of 4
Part Number: SLP-HT2310K
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K40
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Main Bearings, Competition, Standard Size, Super Duty Alloy, H-14, 3/4 Groove, Mopar, 426 (Wedge Only), 440, Set of 5
Part Number: SLP-119M
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Cast Iron, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K60
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston, Forged, Flat, 4.350 in. Bore, Chrysler, Dodge, Jensen, Plymouth, Set of 8
Part Number: SLP-L2355F30
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Rod Bearing, Standard Size, Tri Metal, Chrysler, Dodge, Jeep, Plymouth, Small Block, Each
Part Number: SLP-2130CP
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.250 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-233K
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Oil Pump, High-Volume, Chrysler, 273/318/340/360, Each
Part Number: SLP-224-4166V
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.280 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-233K30
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Rod Bearings, CP-Series, Tri Metal, Standard Size, Chrysler, Dodge, Plymouth, Jeep, Set of 8
Part Number: SLP-8-2130CP
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Main Bearings, Comp., 0.010 in. Crankshaft Undersize, Super Duty Alloy, H-14, 3/4 Groove, Mopar, 426 (Wedge Only), 440, Set of 5
Part Number: SLP-119M10
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Lifter, Hydraulic Flat Tappet, AMC/Chrysler, Dodge, Jeep, Plymouth, Each
Part Number: SLP-HT-2011
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pistons, Forged, Flat, 4.290 in. Bore, Chrysler, Dodge, Plymouth, Set of 8
Part Number: SLP-L2315NF40
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Lifter, Hydraulic Flat Tappet, AMC/Chrysler, Dodge, Jeep, Plymouth, Each
Part Number: SLP-HT-2011R
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Rod Bearings, CP-Series, Tri Metal, Standard Size, Chrysler, Dodge, Plymouth, Big Block, Hemi, Set of 8
Part Number: SLP-8-2320CP
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Main Bearings, Standard Size, Bi Metal, 1/2 Groove, Chrysler, Dodge, Plymouth, 360, Set of 5
Part Number: SLP-4999MA
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cam Bearings, Direct Replacement, Steel Backed Babbit, Mopar, Big Block, Set
Part Number: SLP-1453M
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, 4.020 in. Bore, 5/64, 5/64, 3/16, .200 in. Deep Oil Groove, Moly Top Ring, Set
Part Number: SLP-E-251K20
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Piston Rings, Moly, 4.290 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-233K40
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.