Availability
DODGE AVENGER Parts and Accessories
HYDRAULIC AUTO TENSIONER CHRYSLER-300 300M CONCORDE INTREPID PACIFICA SEBRING TOWN & COUNTRY 10-05 DODGE-AVENGER CHALLENGER CHARGER GRAND CARAVAN
Part Number: GMB-420-3337
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Water Pump, Replacement, Standard Volume, Mitsubishi, Each
Part Number: GMB-148-1510
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Rack and Pinion Seal Kit, Chrysler, Dodge, Eagle, Misubishi, Kit
Part Number: EDD-8870
Not Yet Reviewed
Estimated Ship Date: Apr 23, 2026 if ordered today
Estimated Ship Date: Apr 23, 2026 if ordered today
Tensioner, Timing, Global 5310002300, Each
Part Number: IFE-ZT0023
Not Yet Reviewed
Estimated Ship Date: May 15, 2026 if ordered today
Estimated Ship Date: May 15, 2026 if ordered today
Engine Connecting Rod 07-10 CHR/DOD 3.5L
Part Number: EGN-ECR121
Not Yet Reviewed
Estimated Ship Date: Apr 30, 2026 if ordered today
Estimated Ship Date: Apr 30, 2026 if ordered today
PS HOSE
Part Number: EDD-81242
Not Yet Reviewed
Estimated Ship Date: Apr 23, 2026 if ordered today
Estimated Ship Date: Apr 23, 2026 if ordered today
TRAILING ARM
Part Number: DFP-TC7948
Not Yet Reviewed
Estimated Ship Date: Apr 24, 2026 if ordered today
Estimated Ship Date: Apr 24, 2026 if ordered today
Suction Line Hose Assembly
Part Number: FSS-55232
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
ENG OIL PAN
Part Number: ATP-103061
Not Yet Reviewed
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Flexplate, 139-tooth, Steel, Internal Balance, Chrysler, Dodge, Eagle, Plymouth, Each
Part Number: ATP-Z331
Not Yet Reviewed
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Tire, RB-12, 215/65-16, All-Season, Radial, Blackwall, 8.70 in. Section Width, T Speed Rating, SL Load Range, 1,653 lbs. Max Load, Each
Part Number: IRN-91173-1
Not Yet Reviewed
Estimated Ship Date: May 1, 2026 if ordered today
Estimated Ship Date: May 1, 2026 if ordered today
Ignition Coil, OEM Replacement, Toyota, Geo, Chevy, L4, Each
Part Number: SMP-UF403
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Timing Belt Idler Pulley, Serpentine, Steel, Chrysler, Dodge, Volkswagen, Each
Part Number: CLO-9-5554
Not Yet Reviewed
Estimated Ship Date: Apr 22, 2026 if ordered today
Estimated Ship Date: Apr 22, 2026 if ordered today
2014 - 2011 Chrysler 200; 2010 - 2008 Chrysler Cirrus; 2010 - 2007 Chrysler Sebring; 2014 - 2008 Dodge Avenger; 2012 - 2007 Dodge Caliber; 2020 - 200
Part Number: SMP-UF557TK4
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Control Arm, Driver Side Front Lower, Cast Iron, Natural, Dodge, Each
Part Number: RNB-521-707
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Door Handle, Interior, Stock Design, Plastic, Chrome, Front Driver Side, Dodge, Each
Part Number: RNB-96474
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
EGR Valve, Chrysler, Dodge, 2.5L, , Each
Part Number: SMP-EGV595
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Adapter, Vehicle Towing Harness, T-Connector, Chrysler, Dodge, Each
Part Number: CHT-56211
Estimated Ship Date: Apr 22, 2026 if ordered today
Estimated Ship Date: Apr 22, 2026 if ordered today
EGR VALVE
Part Number: HLN-2EGR0064
Not Yet Reviewed
Estimated Ship Date: Apr 22, 2026 if ordered today
Estimated Ship Date: Apr 22, 2026 if ordered today
CONTROL ARM
Part Number: RNB-CB30821
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Hub Assembly Jeep,Mitsubishi,Mopar 07-17
Part Number: FWB-102128
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Coil Spring Isolator, Chrysler 2014-07, Dodge 2014-07, Jeep 2017-07
Part Number: RNB-CSI83145
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-340094
Not Yet Reviewed
Estimated Ship Date: Apr 24, 2026 if ordered today
Estimated Ship Date: Apr 24, 2026 if ordered today
Axle Shaft, Direct Fit, New CV Axle Assembly, Front Passenger Side, Steel, Chrysler, Dodge, V6, 2.7L, Each
Part Number: GNA-NCV12547
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Suspension Ball Joint, Ball Joint
Part Number: DFP-TC7695
Not Yet Reviewed
Estimated Ship Date: Apr 24, 2026 if ordered today
Estimated Ship Date: Apr 24, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster