Summit Racing SpeedCard - learn how to get 10% back up to $100

Summit Racing SpeedCard - learn how to get 10% back up to $100

Haul in the Savings - Shop the Truck Savings Event Today!

8 Results Found For "Edelbrock Performer RPM intake"

Individual Parts

Results 1 - 8 of 8

Intake Manifold, Performer RPM, Dual Plane, Aluminum, Natural, Square Bore, Mopar, 318/340/360, Each

Part Number: EDL-7176

4.11 out of 5 stars ( 9 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Natural, Square Bore, Mopar, Small Block, Each

Part Number: EDL-7576

4.5 out of 5 stars ( 34 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Natural, Square Bore, Mopar, 5.2, 5.9L, Each

Part Number: EDL-7577

4.73 out of 5 stars ( 15 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold, Performer, Dual Plane, Aluminum, Natural, Square/Spread Bore, Non-EGR, Mopar, SB, Each

Part Number: EDL-2176

4.33 out of 5 stars ( 24 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 308/318, Lift .488/.510, Mopar, Small Block, Kit

Part Number: EDL-7177

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold, Performer, Dual Plane, Aluminum, Natural, Square/Spread Bore, W/EGR. Mopar, 318/340/360, Each

Part Number: EDL-3776

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Intake Manifold, Performer, Dual Plane, Aluminum, Black, 4-barrel Mounting, Non EGR, Chrysler, Small Block

Part Number: EDL-21763

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

Camshaft, Rollin' Thunder Hydraulic Roller, Advertised Duration 286/294, Lift .544/.541, Chrysler SB LA, Each

Part Number: EDL-2213

Not Yet Reviewed

Estimated Ship Date: Monday 9/22/2025

...Loading

Estimated Ship Date: Monday 9/22/2025

  • 1
  • Page 1 of 1

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.