Availability
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 268/280, Lift .477/.480, Mopar, Small Block, Kit
Part Number: CCA-CL20-223-3
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Internal Balance, Steel, Black, Dodge, Cummins Diesel, Each
Part Number: FLU-920321
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Sportsman, External/Internal Balance, Black, Dodge, Pymouth, Jeep, Chrysler, Small Block, Each
Part Number: PQX-2331841
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chrysler/Dodge, Small Block V8, Set
Part Number: HRS-94330
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, PQx, Internal/External Balance, Black, Dodge, Plymouth, Chrysler, Small Block, Each
Part Number: PQX-2431841
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Adapter, Oil Filter Bypass, Sandwich, Aluminum, Black Anodized, 3/4-16 in. Thread, 3/8 in. Inlet/Outlet, Each
Part Number: EAR-510ERL
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rod, H-Beam, 4340 Forged Steel, Cap Screw, Floating, 7.100 in. Length, Chevy, Chrysler, Set of 8
Part Number: ESP-7100C3D2000
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pulleys, Ultra, Serpentine, Aluminum, Clear Powdercoated, Chrysler, Dodge, Plymouth, RB Big Block, Kit
Part Number: MCH-40570
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, Premium Ductile Ring Sets, Standard Size, 4.000 in. Bore, Plasma-moly, 1.5mm, 1.5mm, 4.0mm Ring Thickness, L8, V8, Set of 8
Part Number: HSN-2M4726
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, Gold Series, Double Roller, Billet Steel Sprockets, Mopar, Big Block, 3-Bolt, Set
Part Number: RMR-NA-CS5150
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Water Pump Pulley, OEM Style, Dual V-Belt Groove, 5.938 in. O.D., Steel, Black Hardcoated, Mopar, Big Block, Each
Part Number: VTA-735011
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rod Bearings, Stock Size, XP-Series, Tri-Metal, Large Journal, Chevy, Small Block, Set of 8
Part Number: KGB-CR807XPDSTDX
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head Bolts, High Performance, 12-Point Head, Chrysler, Big Block, B/RB, Kit
Part Number: ARP-145-3706
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Main Bearing, XP-Series, Copper/Lead/Nickel, 0.010 in. Crankshaft Undersize, Chevy, Small Block, Set of 5
Part Number: KGB-MB557XP010
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, Heavy Duty, Double Roller, Iron/Billet Steel Sprockets, Mopar, 318/360, Set
Part Number: CLO-C-3028X
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Pro Touring, Steel, Gold Iridite, 7 qt., Mopar, Big Block, B/RB/Hemi, Fits A, B and E Bodies, Comp Baffling, Each
Part Number: MIL-31581
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Main Bearings, H Series, Full Groove, TM-77, Chrysler, Dodge, Plymouth, 5.9L, Set of 5
Part Number: CLE-MS1266HG
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, Piston Ring Sets, Phosphate Coated, 4.030 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, L8, V8, Set of 8
Part Number: HSN-C5532030
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rod Bearing, H Series, .001 in. Thinner, TM-77, Chrysler, Dodge, Plymouth, 273, 318, 340, 360, Each
Part Number: CLE-CB481HXN
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crank Pin Drill Fixture Kit, Billet Steel, 11/64 in, Drill Bit Size, Kit
Part Number: ATI-918008-1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Dr..side,
Part Number: SUM-HEMI2125761D
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Pass.side,
Part Number: SUM-HEMI2125761P
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pulley, Power Steering, Saginaw, V-Belt, 1-Groove, Keyway, Steel, Chrome, 5.800 in. Diameter, Each
Part Number: LSC-160
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Filter Relocation Kit, Dual Filter, 72 in. Hose Length, Kit
Part Number: SUM-G4986-1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, 4.020 in. Bore, 5/64, 5/64, 3/16, .200 in. Deep Oil Groove, Moly Top Ring, Set
Part Number: SLP-E-251K20
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.