Availability
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Mopar, Big Block, Set
Part Number: SUM-G6510
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Engine Bolts, Stainless Steel, Natural, Hex Head, Chrysler, Small Block, Kit
Part Number: SUM-56330HS
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar BB, Dowled, .010 undersized (thicker), set
Part Number: SUM-527HD010
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Combo, Engine Oil Change Kit, 5W30 6 Qts., Kit
Part Number: CMB-08-0098
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Pro Hemi Stage 6 Hydraulic Roller Cam, 232/248 Duration @.050, 120 LSA + 4 adv, .625/.625 Lift, 3500-7500 Range, Each
Part Number: SUM-5719
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, G3 Hemi .010 undersize (thicker), set
Part Number: SUM-1808H25
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
SB Mopar 360 Forged Steel Crank, 4.000 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3604000
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
SB Mopar 360 Forged Steel Crank, 3.580 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3603580
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 Extra Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HXS
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
6.4 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5727
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
6.4 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5726
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pan Drain Plug, Magnetic, Steel, Chrome Plated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102C
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Dr. Side,
Part Number: SUM-HEMI1855761D
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve Covers, Tall, Cast Aluminum, Finned, Polished, Dodge, Mopar, Small Block Magnum, Pair
Part Number: SUM-440425
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pan Drain Plug, Magnetic, Steel, Natural Finish, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head Studs, Extreme Duty, 12-Point, Chromoly, Black Oxide, 5.9 Cummins 12 valve, Kit
Part Number: SUM-910510
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Forged Pro pistons for Chrysler 360 stroker, 4.040 bore, 1.465 C.H., 4 in. stroke, 6.123 in. rod, 15cc Dish 10.9@60cc, 10.5@63cc, 10.3@65cc, 9.6@73cc
Part Number: SUM-360040STR
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Forged Pro pistons for Chrysler 360 stroker, 4.030 bore, 1.465 C.H., 4 in. stroke, 6.123 in. rod, 15cc Dish 10.9@60cc, 10.5@63cc, 10.3@65cc, 9.6@73cc
Part Number: SUM-360030STR
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pro Hemi Stage 3 Hydraulic Roller Cam, 218/224 Duration @.050, 114.5 LSA + 1.5 adv, .600/.585 Lift, 2900-6900 Range, Each
Part Number: SUM-5713
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pro Hemi Big Gun 4 Hydraulic Roller Cam, 251/257 Duration @.050, 116.5 LSA + 5 adv, .625/.625 Lift, Valve Reliefs Required, 3800-7800 Range, Each
Part Number: SUM-5744
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Pass.side,
Part Number: SUM-HEMI1855761P
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Forged Pro pistons for Chrysler 440, 4.350 bore, 2.065 C.H., 3.75 in. stroke, 6.76 in. rod, 8cc flat top. 10.75@75cc, 10.5@78cc, 9.9@84cc, 9.5@88cc.
Part Number: SUM-BBM440030
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Forged Pro pistons for Chrysler 360, 4.030 bore, 1.670 C.H., 3.580 in. stroke, 6.123 in. rod, 7cc flat top 10.8@60cc, 10.4@63cc, 10.2@65cc, 9.4@73cc.
Part Number: SUM-SBM360030
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 undersize (thicker) 1/2 Upper groove, set
Part Number: SUM-2221H025
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pro Hemi Stage 5 Hydraulic Roller Cam, 228/244 Duration @.050, 118 LSA + 4 adv, .625/.625 Lift, 3300-7300 Range, Each
Part Number: SUM-5718
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.