Availability
DODGE Summit Racing Parts and Accessories
Automatic Transmission Rebuild Kit, Heavy-Duty, Dodge, 46RE, 47RE, 48RE, Kit
Part Number: SUM-705048
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiator, Exact Fit, Aluminum, Plastic, Dodge, 3.9L, 5.2L, 5.9L, Each
Part Number: SUM-380543
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Nerf bar, Summit Racing™, Stainless Steel, Polished, 3.000 in. Diameter, Cab Length, MegaCab, Dodge, Pair
Part Number: SUM-71000318
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cab Visor, Sportvisor, Lighted, Fiberglass, White Gelcoat, Dodge, Pickup, Each
Part Number: SUM-480172
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Pump Block-Off Plate, Aluminum, Blue Anodized, Chevy, Chrysler, Ford, Dodge, Plymouth, Each
Part Number: SUM-420006
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Combo, Edelbrock, Dual Quad, Intake Manifold, Natural, Carburetors, 600 CFM, Chrysler, 413, 426, 440, Kit
Part Number: CMB-03-0150
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Disc Brake Kit, Front Conversion, Power, Solid Surface Rotors, Cast Iron Calipers, Zinc Plated, 5 x 4.5 in., Chrysler, Dodge, Plymouth, Kit
Part Number: SUM-BK-45052
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Tank Caps, Steel, Silver, for Nissan, AMC, Aston Martin, Chevrolet, Chrysler, Dodge, GMC, Plymouth, Pontiac, Renault, Subaru, Toyota, Each
Part Number: SUM-290175
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro BBM MOPAR Best Hydraulic Roller Cam 1, 212/218 Duration, 111 LSA + 2 Adv. .525/.520 1.5 rocker, .560/.555 1.6 rocker, 1,800-5,500 basic rpm range
Part Number: SUM-5780
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Chrysler LA Long Snout Hydraulic Roller Cam 1, 212/218 Duration, 111 LSA + 2 Adv. .525/.520 lift 1.5 ratio, .560/.554 1.6 ratio, 1,800-5,800 rpm
Part Number: SUM-5770
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro BBM MOPAR Best Hydraulic Roller Cam 3, 224/236 Duration, 111 LSA + 1 Adv. .550/.550 1.5 rocker, .587/.587 1.6 rocker, 2,400-6,000 basic rpm range
Part Number: SUM-5782
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Water Pump, Mechanical, High-Volume, Cast Iron, Chrome, Chrysler, 361/383/400/413/426/440, Each
Part Number: SUM-311020
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Brake Rotors, Drilled/Slotted, Iron, Zinc Dichromate Plated, Rear, Chrysler, Dodge, Pair
Part Number: SUM-BRC-63062PR
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Ignition Tune-Up Kit, Dodge, Dakota, 3.9L V6, Kit
Part Number: SUM-867624CR
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifter kit, Muscle Car Cam, 340 4bbl, Hydraulic Flat Tappet, 1,500-4,000 RPM Range, Advertised Duration 279/289, Lift .429/.444, SB Mopar
Part Number: SUM-K6920
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Wheel, Venom, Aluminum, Gloss Black, Polished Lip, Machined Accents, 17 in. x 8 in., 5 x 4.50 in./114.3mm Bolt Circle, 5.50 in. Backspace, Each
Part Number: SUM-149P-786525
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Distributor, Ready-to-Run, Magnetic Pickup, Vacuum Advance, Chrysler, 383-400, Big Block B, Each
Part Number: SUM-850423-1S
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Disc Brake Kit, Front Conversion, Power, Solid Surface Rotors, Cast Iron Calipers, Zinc Plated, 5 x 4.5 in., Chrysler, Dodge, Plymouth, Kit
Part Number: SUM-BK-45036
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Transmission Filter, Direct Fit, Black Fiber, Includes Spin On Filter, Dodge, Jeep, Kit
Part Number: SUM-G19012F
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Exhaust System, Cat-Back, 3.00 inch, Passenger Side Exit, Steel, Aluminized, Dodge, Pickup, 5.7L, Kit
Part Number: SUM-685016
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 1, 212/218 Duration, 111 LSA + 2 Adv. .560/.554 lift 1.6 ratio, .595/.588 1.7 ratio, 1,500-6,000 rpm
Part Number: SUM-5775
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Sound Deadener, Under Carpet, Dodge/Plymouth 1967-76 A-Body, 1966-74 B-Body and 1970-74 E-Body, 4-Piece Kit
Part Number: SUM-RP80334
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 Extra Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HXS
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shocks and Struts, Summit Racing™ Truck Shocks, Twin-Tube, Red Boot, Front, Chevrolet, GMC, Ford, Mazda,, Each
Part Number: SUM-G7773
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Distributor, Electronic, Cast Aluminum, Magnetic Pickup, Black Cap, Mopar, Chrysler, 383/400, B Engine, Each
Part Number: SUM-851017
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster