Availability
DODGE Summit Racing Parts and Accessories
Cap and Rotor, Tan, Female/Socket, Brass Terminals, Clamp-Down, Mopar, Summit, V8, Kit
Part Number: SUM-G5244
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Monotube, Adjustable, Rear, Chrysler, Dodge, Plymouth, RWD, Each
Part Number: SUM-G7703
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Blue, 5-90 Degree / 3-180 Degree Spark Plug Boots, 180 Degree Socket Distributor Boots, Mopar B/RB, Set
Part Number: SUM-G819
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Monotube, Adjustable, Front, Dodge, Plymouth, RWD, Each
Part Number: SUM-G7602
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shocks and Struts, Summit Racing™ Truck Shocks, Twin-Tube, Red Boot, Front, Chevrolet, GMC, Ford, Mazda,, Each
Part Number: SUM-G7755
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Gaskets, Intake, Cellulose, Nitrile, 2.27 in. x 1.17 in. Port, .060 in. Thick, Chrysler, 318/340/360, Set
Part Number: SUM-G2418
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Sensor, TPMS, Valve Stem, 433 MHz AM, Alpha Romeo, Chrysler, Dodge, Fiat, Jeep, Maserati, Mercedes-Benz, Ram, Volkswagen, Smart, Each
Part Number: SUM-RDE036
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Intake Bolts, Extreme Duty,12-Point, Chromoly, Nickel plated, 170,000 psi, 3/8-16 x 1.750 in. UHL, 318-360 LA Mopar, with Washers, 12-pieces, Kit
Part Number: SUM-910505
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Timing Cover, One-piece, Steel, Chrome, Dodge, Big Block, Kit
Part Number: SUM-G3335
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Diesel Fuel Injector Tubes, Steel, Dodge, Each
Part Number: SUM-240075-C
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cap and Rotor, Blue, Female/Socket, Brass Terminals, Clamp-Down, Chrysler, Dodge, Plymouth, 5.2, 5.9L.Kit
Part Number: SUM-G5232
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Exhaust Manifold and Header Gaskets, Steel Core Laminate, Stock Port, Dodge, Small Block, LA, Pair
Part Number: SUM-110460
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7751
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7742
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Automatic Transmission Kickdown Cable, Braided Stainless Steel Jacket, Carburetor, Chrysler, Dodge, Plymouth, Torqueflite A-904, Kit
Part Number: SUM-200043
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Oil Pickup, Screw-In, Street/Strip Pan Style, 1/2 in. NPT, 5.000 in. Pan Depth, 3/4 in. Tube Dia., Mopar, 383, 440, Each
Part Number: SUM-G3509
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Headlight Assembly LH 94-02 Dodge Pickup OEM Style CH2502101 Each
Part Number: SUM-CS060-B001L
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Headlight Assembly RH 94-02 Dodge Pickup OEM Style CH2503101 Each
Part Number: SUM-CS060-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Tail Lamp Assembly RH 05-10 DAKOTA CH2819104 Each
Part Number: SUM-CS172-B000R
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7748
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Tail Lamp Assembly LH 05-10 DAKOTA CH2818104 Each
Part Number: SUM-CS172-B000L
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shocks and Struts, Summit Racing™ Truck Shocks, Twin-Tube, Red Boot, Front, Chevrolet, GMC, Ford, Mazda,, Each
Part Number: SUM-G7773
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Thermostat, 160 Degree, Copper/Brass, Mopar, Each
Part Number: SUM-368-160
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Spark Plug Wires, Summit Street Series, 8mm, 500 Ohm, Black, Straight / 135 Degree Spark Plug Boots, Various Ford, Non-HEI, V-8 Set
Part Number: SUM-877805
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Tank Pad, Reproduction, 1971-74 Dodge/Plymouth B-Body, Each
Part Number: SUM-RP80269
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster