Availability
Steering Box, Power Steering Conversion, Hose Kit, Pump Kit, Dodge, Plymouth, Kit
Part Number: BRG-999065
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
BUILD IT WITH SUMMIT!
Disc Brake Kit, Front Conversion, Manual, Solid Surface Rotors, Cast Iron Calipers, Zinc Plated, 5 x 4.5 in., Chrysler, Dodge, Plymouth, Kit
Part Number: SUM-BK-45050
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Clutch Kit, RST, 1 1/8 in. x 26-Spline, 9.688 in. Diameter Disc, Chevy, Small/Big Block, Kit
Part Number: MCL-6911-07
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $856.00
Rebate Expires: 9/30/2025
Headers, Long Tube, 409 Stainless Steel, Chrysler, Dodge, Each
Part Number: JBA-6966S
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $856.00
Rebate Expires: 9/30/2025
Estimated Ship Date: Monday 9/15/2025
Headers, Long Tube, Steel, Titanium Ceramic, Chrysler, Dodge, Pair
Part Number: BBK-4046
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Power Steering Conversion Kit, Black Painted, Chrysler, 1.125 in. Diameter Pinion Shaft, Each
Part Number: BRG-999063
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Differential, Eaton Detroit Truetrac, 30-Spline, Chrysler, 8.75 in., Each
Part Number: ETN-913A572
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Clutch Kit, RST, 1 1/8 in. x 26-Spline, 9.687 in. Diameter Disc, Chevrolet, Ford, Kit
Part Number: MCL-6913-07
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
HP Tuner, MPVI3, Pro Feature Set, 8 Universal Credits, Kit
Part Number: HPT-M03-000-08
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 75cc Chamber, 210cc Intake Runner, Dodge, Big Block, Each
Part Number: EDL-60829
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Disc Brake Kit, Rear Conversion, Solid Surface Rotors, Zinc Plated Calipers, Chrysler, Dodge, Plymouth, Kit
Part Number: LEB-RC2001
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 84cc Chamber, 210cc Intake Runner, Mopar, Big Block, Each
Part Number: EDL-60929
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 84cc Chamber, 210cc Intake Runner, Mopar, Big Block, Each
Part Number: EDL-60925
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Victor Max Wedge, Aluminum, Bare with Valves, 75cc Chamber, 290cc Runner, Mopar, B, RB, Each
Part Number: EDL-77949
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Performer RPM, Assembled, Aluminum, 75cc Chamber, 210cc Intake Runner, Chrysler, Big Block, Each
Part Number: EDL-60825
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Clutch Kit, RXT, 1 1/8 in. x 26-Spline, 9.688 in. Diameter Disc, Chevy, V8, Kit
Part Number: MCL-6921-07
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Radiator, Downflow, 2-row, Aluminum, Natural, Chrysler, Dodge, Each
Part Number: MIO-MMRAD-SRT-15
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Exhaust System Kit; American Thunder Exhaust System; Dual; Dual Rear Exit; Incl. 2.5 in. Tubing; Super 40 Seri
Part Number: FLO-817480
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Clutch Kit, RXT, 1 1/8 in. x 26-Spline, 9.688 in. Diameter Disc, Kit
Part Number: MCL-6923-07
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Ignition Systems, Sniper 1 EFI, HyperSpark, Ignition Box, Coil, Distributor, Wire Harness, Chrysler, Dodge, Plymouth, Big Block, RB, Kit
Part Number: SNE-565-306K
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $856.00
Rebate Expires: 9/30/2025
Headers, Long Tube, Long Tube, Stainless, Natural, 1.75 in. Primary, 3 in. Collector, Dodge, Chrysler, V8, Pair
Part Number: JBA-6965S
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $856.00
Rebate Expires: 9/30/2025
Estimated Ship Date: Monday 9/15/2025
Clutch Kit, RST, 1 in. x 23-Spline, 10.50 in. Diameter Disc, Chrysler, V8, Kit
Part Number: MCL-6913-02
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $726.95
Rebate Expires: 9/30/2025
Tube Size: 1 3/4; Surface: Titanium Ceramic Coated; Direct Replacement For Factory Manifold, Installation Hard
Part Number: JBA-1964S-1JT
Estimated Ship Date: Monday 9/15/2025
$75.00 Mail-In Rebate
Price after Manufacturer Rebate: $726.95
Rebate Expires: 9/30/2025
Estimated Ship Date: Monday 9/15/2025
Exhaust System, Cat-back, FlowFX, 409 Stainless Steel, Dual Exit, Chrysler, Dodge, Kit
Part Number: FLO-717831
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Exhaust System, 2005-09 SRT-8 Charger, Magnum, 300C "Loud Mouth" (modular)
Part Number: SLE-D31004
Estimated Ship Date: Mar 18, 2026 if ordered today
Estimated Ship Date: Mar 18, 2026 if ordered today
Headers, Long Tube, Steel, Silver Ceramic Coated, 1.75 in. Primary, Chrysler, Dodge, 5.7L, 6.1L, Pair
Part Number: BBK-16470
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.