Availability
Piston Rings, Premium Ductile Ring Sets, Plasma-moly, 4.350 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, Chrysler, Dodge, Jensen, V8, Set of 8
Part Number: HSN-2M5528030
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve, PCV, OEM Replacement, Chrysler, Dodge, Jeep, Ram, Car, Truck, Van, V6, 3.2L, 3.6L, Each
Part Number: MOP-68083202AC
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Exhaust Gaskets, Ultra-Seal, 2.080 in. x 1.71 in. Port, Chrysler, 440, Indy Heads, Set
Part Number: MRG-5944
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Hi-Energy, RFI Suppression, 8mm, Blue, 90/135 Degree Boots, Chrysler, Big Block, Set
Part Number: TAY-64672
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Engine Oil, Motul 8100 X-Max, Synthetic, 0W40, 5 liters, Each
Part Number: MTL-104533
Cannot be shipped Internationally
Cannot be shipped Internationally
Gasket, Cylinder Head, Stock Replacement, Chrysler, Dodge, Jeep, Right, Passenger Side, Each
Part Number: MOP-05038280AE
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Head Gasket, MLS, 4.120 in. Bore, .040 in. Compressed Thickness, Left, Chrysler, Jeep, Dodge, Each
Part Number: CGT-C5027-040
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oxygen Sensor Extension Harness, 24 in. Length, Factory Connectors, Rear Sensors, For Use With Long Tube Headers, Dodge, Chrysler, V8, Pair
Part Number: SUM-890170
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Main Bearings, P Series, 1/2 Groove, Standard Size, Tri Metal, Chrysler, Dodge, Jeep, 5.7L, Set of 5
Part Number: CLE-MS2220P
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Flexplate, Platinum, High Integrity Series, Internal Engine Balance, SFI 29.1, Mopar, V8, Each
Part Number: PQX-1844010
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tie Rod Sleeves, Steel, Black Keyfaust, with Jamb Nuts, Machined "H" Logo, GMC/Chevy, Pontiac, Pickups/Cars, Pair
Part Number: HSS-1612
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Flame-Thrower, Spiral Core, 7mm, Black, 90 Degree Boots, Chrysler, Dodge, Plymouth, V8, Set
Part Number: PNX-708107
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Super Stock, Spiral Core, 8mm, Black, 90 Degree Boots, Universal, V8, Set
Part Number: ACC-5041K
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Heater Cores, Classic OEM, Copper/Brass, Natural, Chrysler, Dodge, Plymouth, Each
Part Number: SUM-382188
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Electric Fan, Single, 16 in. Diameter, Reversible, 1,400 cfm, Black, Plastic, Each
Part Number: HDA-3700
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Head Gaskets, Laminate, 4.505 in. Bore, .038 in. Compressed Thickness, Mopar, Big Block, B/RB, Pair
Part Number: EDL-7325
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
SOLENOID, OIL CONTROL, 2008-2022
Part Number: MOP-53022338AB
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Main Bearings, P Series, 1/2 Groove, .010 in. Crankshaft Undersize, Tri Metal, Mopar, 5.7, 6.1L, Set
Part Number: CLE-MS2220P25MM
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft Phaser, Timing Sprocket, Chrysler, Dodge, Jeep, Ram, Each
Part Number: SMP-VVT604
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Carburetor Rebuild Kit, Carter, AVS, Kit
Part Number: SMP-446B
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rod Bearings, HP Series, Bi-metal, Silicon Aluminum, Standard Size, Chrysler, Dodge, Plymouth, Set of 8
Part Number: KGB-CR806HPND
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Timing Chain, OEM Replacement, Dodge, Chrysler, Ram, Jeep, 5.7L, 6.2L, 6.4L, Each
Part Number: MOP-53022316AC
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Moly, 4.320 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-424K
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pump, Standard-Volume, Standard Pressure, Chrysler, Dodge, Jeep, 5.7L, Each
Part Number: MEL-M342
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Brake Pads, Z23 Evolution Sport, Carbon Fiber Ceramic, Set
Part Number: PWR-Z23-1053
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.