Availability
Spark Plug, Ruthenium HX, 14mm Thread, Heat Range 5, 26.5mm Reach, Gasket Seat, Double Fine Electrode, Each
Part Number: NGK-96355
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, E3, Gasket Seat, 14mm Thread, 1.00 in. Reach, Projected Tip, Resistor, Each
Part Number: ETP-E368
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Distributor Conversion, Ignitor II®, 12 V, Kit
Part Number: PNX-91381A
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Distributor, Electronic, Vacuum Advance, Chrysler, Dodge, Plymouth, Big Block, Hemi, RB Engine, Kit
Part Number: PRO-66995
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Alternator, 165 Amp, Natural, 2-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-48529
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, Iridium IX, Tapered Seat, 14mm Thread, 25mm Reach, Projected Tip, Resistor, Each
Part Number: NGK-2314
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Alternator, 220 Amp, Natural, 1-Groove V-Belt Pulley, Chrysler, Dodge, Plymouth, Each
Part Number: PWM-8-48539-120
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Ignition Coil, SuperStock, Canister, Round, Oil-Filled, Yellow, 45,000 V, Each
Part Number: ACC-8145
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Computer Programmer, Flashpaq, Chrysler, Dodge, Ram, Each
Part Number: SRC-3845
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug Wires, SuperStock, RFI Suppression, Spiral Core, 8mm, Black, 90 Degree Boots (Black), V8, Set
Part Number: ACC-4041K
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Stoplight Switch, OEM Replacement, Each
Part Number: SMP-SLS66
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Distributors, Sniper EFI, HyperSpark, HEI Cap, Hall Effect, Billet Housing, Black, Ignition Module, Chrysler, Dodge, Plymouth, Big Block, RB, Each
Part Number: SNE-565-306BK
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Starter, High Torque, Lightweight, Mopar, Big B/RB/Small Block LA, Each
Part Number: PRO-66269
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Voltage Regulator, Restoration, Chrysler, Dodge, Plymouth, Each
Part Number: DCC-P4529794
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Starter, Mini, High Torque, Chrome Plated, Mopar, Small/Big Block, Each
Part Number: PWM-19513
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, Copper Core, Resistor, 14mm x 1.25, Gasket Seat, 0.750 in, Reach, Each
Part Number: ATL-65
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, RN14YC, Copper Plus, 14mm Thread, .750 in. Reach, Projected Tip, Resistor, Each
Part Number: CPN-405
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Distributor, Electronic, Billet Aluminum, Magnetic Pickup, Brown Cap, Mopar, Chrysler, B Engine, Each
Part Number: SUM-851007
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Oxygen Sensor Extension Harness, 24 in. Length, Factory Connectors, Rear Sensors, For Use With Long Tube Headers, Dodge, Chrysler, V8, Pair
Part Number: SUM-890170
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Computer Programmer, Predator 2 Platinum, Competition Use Only, Chrysler, Dodge, 5.7L, 6.1L, 6.4L, Each
Part Number: DBL-7310
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug Wires, Street Fire, 8.0mm, Black, Straight Boots, Mopar, Big Block, Set
Part Number: MSD-5531
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug Wires, Spiro Wound, 8mm, Blue, Stock Boots, Chrysler, Big Block, V8, Set
Part Number: SUM-G819
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug Wires, Extreme 9000 Ceramic, Spiral Core, 8mm, Black, White Ceramic Straight Boots, Universal, V8, Set
Part Number: ACC-9000C
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Ignition Coil, Coil-On-Plug, Orange, Chrysler, Dodge, Jeep, Hemi, Set of 8
Part Number: RIP-MV8CPK
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, Iridium, Gasket Seat, 12mm Thread, 1.103 in. Reach, Resistor, Each
Part Number: CPN-9407
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.