Availability
Relay, Starter, 25 amp, 4 Terminal, Male Blade/Screw, Chrysler, Dodge, Plymouth, Each
Part Number: SMP-SR107
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Power Steering Hose and Line, Return Hose, Low Pressure, Rubber, Black, for Hyundai, for Nissan, Buick, Chevy, Chrysler, Dodge, Ford, GMC, Each
Part Number: EDD-71236
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Fans, Electric, Single, Puller, Plastic Blades, Black Plastic Shroud, 14.00 in. Diameter, Each
Part Number: FSS-37140
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Cover Gaskets, Cork/Rubber, Dodge, Chrysler, Plymouth, Big Block, Pair
Part Number: MRG-378
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Cover Gasket, Aramid Fiber, .094 in. Thickness, Mopar, Big Block B/RB, 6 Bolt Cover, Each
Part Number: CGT-C5613-094
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Power Steering Hoses and Lines, Return Line Assembly, Braided Fiber, Natural, AMC, Audi, Chrysler, Ford, GM, Subaru, Suzuki, Toyota, Volkswagen, Each
Part Number: SUG-3501105
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshafts, Thumpr Hydraulic Flat Tappet, Advertised Duration 279/296, Lift 0.486/0.473, Chrysler, Dodge, Plymouth, Big Block, Each
Part Number: CCA-23-600-5
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Throwout Bearing, 1400 Series, Hydraulic, 1.250 in. Diameter, Billet Aluminum Bearing, Includes Master Cylinder and Hardware, Mopar, A833, Each
Part Number: MCL-14065-10
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Crankshaft, 2-piece seal, Internal balance, Forged 4340 Steel, 4.625 in. Stroke, 2.200 Pin, Mopar, Each
Part Number: CPI-GER-62L-CS
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Timing Gear Replacement Part, Roller Thrust Bearing, Chevy, Chrysler, Dodge, Plymouth, Each
Part Number: MIL-12559
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Spark Plug Wires, Black Wire, Black Boots, Set
Part Number: SMP-2804W
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Main Bearings, SI-Series, 1/2 Groove, Bi-metal, Silicon Aluminum, Chyrsler, Big Block, Set of 5
Part Number: KGB-MB5116SI
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Starter, Protorque, Mini, 1.9 HP, Standard Mount, Dodge, Chrysler, Plymouth, Each
Part Number: CVS-1337
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Battery Cable, Direct Fit, Assembled, Negative, Each
Part Number: SMP-A30-4U
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Thermostat Housing - Chrysler Straight - 1-1/2" Hose - Black
Part Number: CVS-TSH8SBK
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Bellhousing Inspection Cover, Steel, Black, Each
Part Number: AWR-BHCH-10004C
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Head Gasket, MLS, 4.500 in. Bore, .070 in. Compressed Thickness, Chrysler, Dodge, Plymouth, Each
Part Number: CGT-C5464-070
Not Yet Reviewed
Estimated Ship Date: Oct 8, 2025 if ordered today
Estimated Ship Date: Oct 8, 2025 if ordered today
Estimated Ship Date: Monday 8/25/2025
Timing Belt Drive System, 2-Piece Upper Pulley Belt Drive, Dry, BB Chrysler +0.250 Raised Cam, Kit
Part Number: JES-KBD-35800
Not Yet Reviewed
Estimated Ship Date: Sep 5, 2025 if ordered today
Estimated Ship Date: Sep 5, 2025 if ordered today
Head Gasket, MLS, 4.350 in. Bore, .080 in. Compressed Thickness, Chrysler, Dodge, Plymouth, Each
Part Number: CGT-C5460-080
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Head Gasket, MLS, 4.380 in. Bore, .084 in. Compressed Thickness, Chrysler, Dodge, Plymouth, Each
Part Number: CGT-C5461-084
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Cam Bearings, Steel Backed Babbitt, Set
Part Number: KGB-CS533BB
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve, Exhaust, Stainless Steel, 1.810 in. Diameter, .341 in. Stem, Mopar, for Edelbrock Victor Heads, Each
Part Number: EDL-93776
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer Spacer, Chrysler, .093 in. Thick, Each
Part Number: ATI-916370
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Shift Improver, Chrysler, 727, A-904, Each
Part Number: BMM-10226
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.