Availability
724 Results Found For "Engine"
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT5
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6906
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.135 in. Length, 650 HP, Chevy, Big Block, Set of 8
Part Number: SUM-180375P
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8726R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Stage 5 Pro LS Twin-Turbo Cam. 247/251 Dur., 117.5+5.5, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8725R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pistons, Forged, Flat, 4.040 in. Bore, Chevy, Set of 8
Part Number: SUM-17365FC-40
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro SBC Hyd. Roller Cam, Turbo Stage 4, 242/242 Duration, 117.5 LSA + 9.5 Adv., 550/550 Lift with 1.5 Ratio, .587/.587 1.6 Ratio, 3500-7400 Rpm Range
Part Number: SUM-8808
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
PRO BBC H.R. 1 Hydraulic Roller Cam, 4/7 Swap, 204/214 Duration @ .050, 110 LSA + 4 Adv. , .510/.510 with 1.7 ratio, .540/.540 with 1.8, Idle-5600
Part Number: SUM-1251
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
PRO BBC H.R. 8 Hydraulic Roller Cam, 4/7 Swap, 252/258 Duration @ .050, 112.5 LSA + 8.5 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3900-6800
Part Number: SUM-1258
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 304/316, Lift .540/.540, Chevy, Big Block, Kit
Part Number: SUM-K1303
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
PRO BBC H.R. 2 Hydraulic Roller Cam, 4/7 Swap, 212/218 Duration @ .050, 110 LSA + 5 Adv. , .595/.588 with 1.7 ratio, .630/.623 with 1.8, 2300-5800
Part Number: SUM-1252
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro SBC Best Hydraulic Roller Cam, Roller Block, 248/258 Dur.109.5 LSA + 3.5 Adv. .550/.550 lift with 1.5 rocker, 587/.587 1.6, ea
Part Number: SUM-8813
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS S.P.6 Cam, 256/270 Duration, 108 LSA + 4 Adv, .625/.625 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8745R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 296/312, Lift .536/.527, Chevy, Small Block, Kit
Part Number: SUM-CT104K
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LT Gen. V, Truck Torkinator Best 6.2 Drop-In Cam, 212/222 Duration, 110 LSA + 3 Adv. .540/.540 Lift, LT4 Fuel Lobe, VVT Limited, AFM Delete
Part Number: SUM-8751
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cylinder Head Fasteners, Extreme Duty, 12-point Head Style, Stud, Chromoly, Black Oxide, Duramax, Kit
Part Number: SUM-910524
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 289/300, Lift .525/.525, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8700-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Oil Pan, Steel, Spin-On Filter, Chrome, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612C-K
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS S.P.3 Cam, 238/255 Duration, 110 LSA + 5 Adv,.625/.605 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8742R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 2 Hyd. Flat-Tappet 4/7 Firing Order Swap, 212/218 Dur., 111 LSA + 2 Adv, .428/.450 1.5 Ratio, 1000-5550 Range
Part Number: SUM-K1201
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pistons, Forged, Flat, 4.060 in. Bore, Chevy, Set of 8
Part Number: SUM-17360FC-60
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8714-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6811G
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Flywheel, Billet Steel, 168-Tooth, 30 lb., Internal Engine Balance, Chevy, Big, Small Block, Each
Part Number: SUM-700180
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS S.P.1 Cam, 226/248 Duration, 111 LSA + 5 Adv, .625/.605 lift, 3-Bolt, compatible with SUM-174005 springs. Gen, 3/4 5,3 5,7 6,0 6.2 7.0
Part Number: SUM-8740R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster