Availability
Starter, Mini, Hi-Torque, Inline Bolts, Chevy, Big/Small Block, Each
Part Number: SUM-829105
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Ignition Coils, Coil Pack, Epoxy, Square, Black, LS, V8, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Set of 8
Part Number: SUM-850504B
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Alternator, Internal Regulator, 140 Amp, Natural Finish, Buick, Chevy, GMC, Oldsmobile, Pontiac, Each
Part Number: SUM-810344
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Starter, Mini, Inline Mounting, Chevy, Each
Part Number: SUM-820323
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Ignition Coils, Coil Pack, Epoxy, Square, Red, LS, V8, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Set of 8
Part Number: SUM-850504R
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, White Ceramic, Spiral Core, 8mm, Black, 135 Degree Boots, GM, Saab, Isuzu, Hummer, Set
Part Number: SUM-881102
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Magnetic Pickup, Mechanical Advance, Black Cap, Chevy, Big/Small Block V8, Each
Part Number: SUM-850050
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Optispark II, Optical Trigger, Electronic Advance, Buick, Chevy, Pontiac, 5.7L, LT1, Each
Part Number: SUM-850060
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Ready-to-Run, Magnetic Pickup, Vacuum Advance, Black Powdercoated, Chevy, Big/Small Block, V8, Each
Part Number: SUM-850205-B
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Optispark I, Black Cap, Chevy, Small Block, LT, V8, Each
Part Number: SUM-850059
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Red, 90 Degree Spark Plug Boots, SBC HEI, Over Valve Covers, V8, Set
Part Number: SUM-868836R
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Alternator, Internal Regulator, 100 Amp, 1-Wire, Chrome Plated, GM, Each
Part Number: SUM-G1667A
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Starter, Mini, Staggered Bolt Pattern, Chevy, V8, Each
Part Number: SUM-820323-OS
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Starter, Mini, Hi-Torque, Chrome, Inline Bolts, Chevy, Big/Small Block, Each
Part Number: SUM-829105C
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Magnetic Pickup, Vacuum Advance, Black Cap, Chevy, Big/Small Block V8, Each
Part Number: SUM-850055
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Distributor, Blueprinted HEI, Adjustable Vacuum Advance, Corvette Tach Drive, Black Cap, Chevy, Big/Small Block, Each
Part Number: SUM-850001-T
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Direct Fit Single Wire Electronic Ignition Distributor Conversion Kit , Delco Distributor, Negative Ground, 8 Cylinder, 12 V, Hall Effect, Kit
Part Number: SUM-RP20489
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Red, 9" Leads, OEM Spark Plug Boots That Accept Heat Shields, LS, V8, Set
Part Number: SUM-867828R
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, 88 Series, Street / Strip, 8.5mm, Black, 50 Ohm, 90 Degree Spark Plug Boots, Chevy, BBC, V8, Set
Part Number: SUM-889009
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Battery, Red Top, Starting, 800 Cold Cranking Amps, Top and Side Post, BCI Group 12V, Hold Down and Cable Included, Kit
Part Number: CMB-06-0122
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Spark Plug Wires, Black Ceramic, Spiral Core, 8mm, Black, 135 Degree Boots, GM, Saab, Isuzu, Hummer, Set
Part Number: SUM-881112
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Red, 12" Leads, OEM Spark Plug Boots That Accept Heat Shields, LS, V8, Set
Part Number: SUM-867830R
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Starter, OEM Replacement, Standard Rotation, Natural, Chevy, Pontiac, 5.7L LS, 6.0L LS, Each
Part Number: SUM-829200
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Ignition Combo, MSD 6A Box, Blaster HVC Coil, Pro-Billet Distributor, SF Black Wires, Chevy, Small Block, Kit
Part Number: CMB-06-0120
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Blue, 90 Degree Spark Plug Boots, SBC HEI, Over Valve Covers, V8, Set
Part Number: SUM-868836
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.