Availability
Automatic Transmission Cooler Lines, Steel, Chevy, Powerglide, TH350, Pair
Part Number: CST-CET1006-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Stainless Steel, Chevy, Powerglide, TH350, Pair
Part Number: CST-CET1006-SC
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Hardtop, Each
Part Number: CST-CEV1001-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1002-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1002-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, Chevy, Fits Hardtop Only, Each
Part Number: CST-CEV1004-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, Chevy, Fits Hardtop Only, Each
Part Number: CST-CEV1004-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1005-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1005-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Diameter, Chevy, V8, Each
Part Number: CST-MCV1003-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Return Line, Steel, Natural, Chevy, V8, Each
Part Number: CST-MCR1003-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Fuel Line Diameter, Chevy, 350, 400, 454, Each
Part Number: CST-MCF1003-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless, Natural, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long Bed Dual Tank Models
Part Number: CST-CTF1013-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long and Short Bed Dual Tank Models
Part Number: CST-CTF1015-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, Natural, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits 4WD Models Only, Set
Part Number: CST-CTF1016-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
70-72 Monte Carlo Fuel Line
Part Number: FNL-MGL7001OM
Not Yet Reviewed
Estimated Ship Date: Dec 15, 2025 if ordered today
Estimated Ship Date: Dec 15, 2025 if ordered today
70 Monte Carlo Fuel Line
Part Number: FNL-MGL7003OM
Not Yet Reviewed
Estimated Ship Date: Dec 15, 2025 if ordered today
Estimated Ship Date: Dec 15, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203523
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
68-72 Chevelle / Malibu Hardtop. Brake line kit fits only power brakes w/ the included valve. Includes Front Lines, Front to Rear Line, Valve/Bracket
Part Number: OPS-C1001ADJPV
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Universal Braided Stainless Brake Hose, 18 in. Long, 7/16 in. Banjo, 3/8 in.-24 Inverted Female End, Pair
Part Number: OPS-HK1-18
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
68-72 Chevelle Convertible/El Camino. Brake line kit fits power brakes with included valve. Includes Front Line Kit, Front to Rear Line, Valve/Bracket
Part Number: OPS-C1000ADJPV
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Power Steering Hoses and Lines, Return Line Assembly, Braided Fiber, Natural, Chevy, GMC, Each
Part Number: SUG-3502118
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Smog Tubes, 1969-72 Chevelle/El Camino/Monte Carlo, Small Block
Part Number: OPG-CH30694
Not Yet Reviewed
Estimated Ship Date: Feb 20, 2026 if ordered today
Estimated Ship Date: Feb 20, 2026 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2201164
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Power Steering Hoses and Lines, Pressure Line Assembly, Synthetic Rubber, Natural, Chevy, GMC, Each
Part Number: SUG-3401315
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.