Availability
Loaded Intake, LS1 Truck, Aluminum, 500 HP, Kit
Part Number: FIF-70075
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Manifold, EFI, Pro-Flo XT, Aluminum, Black Powdercoated, Chevy, Small Block, Vortec, E-Tec Heads, Each
Part Number: EDL-71383
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Combo, Marine, Edelbrock, 600 cfm, Electric Choke, Holley, Mechanical Fuel Pump, Chevy, Small Block, Kit
Part Number: CMB-03-0029
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Combo, Edelbrock, Performer, Intake Manifold, Carburetor, 600 CFM, Air Cleaner, Chevy, Small Block, Kit
Part Number: CMB-03-0124
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Intake Manifolds, EFI, LS, Hi-Ram, Base Only, Cathedral Port, Multi-port, Standard Deck, Aluminum, Black Finish, Chevy, 4.8L, 5.3L, 5.7L, 6.0L, Each
Part Number: HLY-300-227BK
Not Yet Reviewed
Estimated Ship Date: Nov 12, 2025 if ordered today
Estimated Ship Date: Nov 12, 2025 if ordered today
Loaded Intake, LS1, Aluminum, 500 HP, Kit
Part Number: FIF-70071
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Carburetor, Street-Q, 850 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-850
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 16 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Truck, Kit
Part Number: SNE-19-156
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 18 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Corvette, Kit
Part Number: SNE-19-148
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Throttle Bodies, LS Style, Multi-Port Injection, Cable Actuated, 90mm Bore, Billet Aluminum, Black Anodized, Chevy, 4.8-7.0L, LS Based, Each
Part Number: HLY-112-589
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Kit
Part Number: SNE-19-124
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Kit
Part Number: SNE-19-176
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 21 Gallon, Steel, Silver, Fuel Pump, 13.5V, 106 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Pontiac, Kit
Part Number: SNE-19-440
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Intake Manifolds, Fuel Injected, LS Single Plane Split-Design Race, Stock/OEM Deck, 2,500-7,000 RPM, Aluminum, Black Ceramic, Chevy, Small Block, Each
Part Number: HLY-300-255BK
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Intake Manifolds, Sniper EFI, Fabricated, Cathedral Port, 102mm Throttle Body, 2,200-6,800 RPM, Aluminum, Black, Chevy, LS, 4.8-6.0L, Each
Part Number: SNE-820042-1
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Nitrous Oxide System, 3-Bolt Throttle Body, Wet, +350 hp, 10 lb. Bottle, GM, LS, Kit
Part Number: NEX-20935-10
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Nitrous Oxide Systems, X-Series, Air Intake Tube Delivery, Wet, 200 hp, 10 lb. Bottle, Black Powdercoated, WOT Switch, Chevy, Kit
Part Number: NXO-22-81000
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 18 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Pontiac, Kit
Part Number: SNE-19-104
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Carburetor, Alcohol, Holley 2-Barrel Flange, 500 cfm, 2-Barrel, Annular, Circle Track, 1.375 in. Rule, Each
Part Number: QFT-XP-4412-A
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 21 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Pontiac, Kit
Part Number: SNE-19-140
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Carburetor, Gasoline, Super Street, 750 cfm, 4-Barrel, Down-Leg, Electric Choke, Mechanical Secondary, Dual Inlet
Part Number: QFT-SS-750
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
INTAKE MANIFOLD
Part Number: BTC-TRA1BLKP105
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Truck, Kit
Part Number: SNE-19-155
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 106 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Nova, Kit
Part Number: SNE-19-416
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Nitrous Oxide System, 4-Bolt Throttle Body, 102mm Plate, Wet, +400 hp, 10 lb. Bottle, Chevy, LS, Kit
Part Number: NEX-20933-10
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.