Availability
CHEVROLET 5.3L/327 Ignitions & Electrical
Spark Plug WIres, Ultra, Chevy SB, Over Valve Covers, 90 Degree Plug Boots, Non-HEI, Black, Set
Part Number: MOR-51526
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2026 if ordered today
Special Offer
Buy these Plug Wires and get a pair of Mechanics Gloves!
Estimated Ship Date: Nov 20, 2026 if ordered today
Spark Plug Wire Set, High Performance, 10mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Blue Wire, Chevy, Small Block, Set
Part Number: SCW-CH-402-4
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug WIres, Ultra, Chevy SB, Under Header, 135 Degree Plug Boots, HEI, Sleeved, Red, Set
Part Number: MOR-52530
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2026 if ordered today
Special Offer
Buy these Plug Wires and get a pair of Mechanics Gloves!
Estimated Ship Date: Nov 20, 2026 if ordered today
Electrical Switches, Auto Metal Direct Electrical Switches, Convertible Top Switch, Chevy, Each
Part Number: AMD-W-081
Not Yet Reviewed
Estimated Ship Date: Dec 14, 2026 if ordered today
Estimated Ship Date: Dec 14, 2026 if ordered today
Wiring Harnesses, Factory-Fit, Engine, Models with Small Block and Warning Lights, Standard Length, Chevy, Each
Part Number: AWW-CH59052
Not Yet Reviewed
Estimated Ship Date: Jan 15, 2027 if ordered today
Estimated Ship Date: Jan 15, 2027 if ordered today
Wiring Harnesses, HEI Engine Wiring Harness, OEM Replacement, Chevy, Each
Part Number: SUM-RP21537
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Engine Harness, 1964-66 Chevy Truck, V8, With Gauges and Over Speed Warning, Each
Part Number: SUM-RP22845
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Below Headers/Manifolds, 30 ohms/ft., Green Wire, Chevy, Small Block, Set
Part Number: SCW-PS-407-4
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Below Headers/Manifolds, 30 ohms/ft., Red Wire, Chevy, Small Block, Set
Part Number: SCW-PS-407-2
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Below Headers/Manifolds, 30 ohms/ft., Orange Wire, Chevy, Small Block, Set
Part Number: SCW-PS-407-6
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Orange Wire, Chevy, Small Block, Set
Part Number: SCW-PS-421-6
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Black Wire, Chevy, Small Block, Set
Part Number: SCW-PS-421-1
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Red Wire, Chevy, Small Block, Set
Part Number: SCW-PS-402-2
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Green Wire, Chevy, Small Block, Set
Part Number: SCW-PS-402-4
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Wiring Harnesses, Interior Light Wiring Harnesses, Extension Harness for Clock and Courtesy Light, Chevrolet, Each
Part Number: AWW-CH73074
Not Yet Reviewed
Estimated Ship Date: Jan 15, 2027 if ordered today
Estimated Ship Date: Jan 15, 2027 if ordered today
Wiring Harness, Console Extension, Restoration , Chevrolet, Each,
Part Number: SUM-RP20090
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Spark Plug Wire Set, High Performance, 9mm Diameter, Male/HEI, Over Valve Covers, 30 ohms/ft., Blue Wire, Chevy, Small Block, Set
Part Number: SCW-PS-402-3
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Distributor Gear, Steel, 0.500 in. Shaft, Chevy, Small, Big Block, Each
Part Number: FIF-99801
Not Yet Reviewed
Estimated Ship Date: Feb 1, 2027 if ordered today
Estimated Ship Date: Feb 1, 2027 if ordered today
Engine Harness, 1964 Chevelle, V8, With Warning Lights, Each
Part Number: SUM-RP23200
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Wiring Harnesses, Engine Wiring Harness, OEM Replacement, Reproduction, Chevy, Each
Part Number: SUM-RP21510
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Battery Tray, Steel, EDP Coated, Chevy, Pontiac, Each
Part Number: GMK-4020-300-67
Estimated Ship Date: Mar 22, 2027 if ordered today
Estimated Ship Date: Mar 22, 2027 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Summit Racing™ Restoration Battery Trays SUM-RP100001
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026
Wiring Harnesses, Instrument Dash Cluster Wiring,Harness, OEM Replacement, Reproduction,Chevy,Each
Part Number: SUM-RP21493
Not Yet Reviewed
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Wiring Harnesses, Add-On, Standard Length, Chevy, Console Harness, Auto Trans, Kit
Part Number: AWW-CA85114
Not Yet Reviewed
Estimated Ship Date: Jan 18, 2027 if ordered today
Estimated Ship Date: Jan 18, 2027 if ordered today
Battery Hold Down; Battery Junction Block
Part Number: GMK-4030-375-644
Not Yet Reviewed
Estimated Ship Date: Mar 22, 2027 if ordered today
Estimated Ship Date: Mar 22, 2027 if ordered today
Spark Plug Wires, Go-Spark, Pre-Made, Ceramic, Black, 8mm, Spiral Core, 90 Degree Boots, Under Header, HEI, Chevy, Small Block, Set
Part Number: FIF-90017
Not Yet Reviewed
Estimated Ship Date: Feb 1, 2027 if ordered today
Estimated Ship Date: Feb 1, 2027 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster