Availability
CHEVROLET 5.3L/327 Parts and Accessories
Rod Chevy Pro Sport H-Beam Arp 8740 7/16 Cap Screws 5.850 Lgt 2.000 Jrnl .927 Pin.940, 2-35058502000-1
Part Number: SCA-6585020-1
Not Yet Reviewed
Estimated Ship Date: Dec 21, 2026 if ordered today
Estimated Ship Date: Dec 21, 2026 if ordered today
Rod Chevy Pro Sport H-Beam Arp 8740 7/16 Cap Screws 6.250 Lgt 2.100 Jrnl .927 Pin.940, 2-35062502100S-1
Part Number: SCA-6625021S-1
Not Yet Reviewed
Estimated Ship Date: Dec 21, 2026 if ordered today
Estimated Ship Date: Dec 21, 2026 if ordered today
SINGLE CONNECTING ROD
Part Number: SCA-6570021-1
Not Yet Reviewed
Estimated Ship Date: Dec 21, 2026 if ordered today
Estimated Ship Date: Dec 21, 2026 if ordered today
Connecting Rod, Sportmaster, 4340 Steel, I-Beam, Cap Screw, Floating, 5.806 in. Length, Chevy, Small Block
Part Number: MAN-14116-1
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
DISC BRAKE KIT
Part Number: CLP-S0111
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Driveshaft; Upgraded Shaft Set For 58-64 Chevrolets; Larger Tube; Thicker Bearing Stub; 1350 U-Joints And Our
Part Number: IED-IE502
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2026 if ordered today
Estimated Ship Date: Nov 18, 2026 if ordered today
Disc Brakes, Front and Rear Big, Cross-drilled/Slotted Surface Rotors, Black, Economy Powder Coat, Chevy, Pontiac, Kit
Part Number: CLP-6869FRBK-BB
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Suspension Package, Grand Slam, Chevy, GMC, Kit
Part Number: CLP-6366GSK-5S
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Disc Brakes, Front and Rear, Power Assist, Solid Surface Rotors, 1-piston Calipers, Front Spindles, Master Cylinder, Chevy, GMC, Kit
Part Number: CLP-6366FRBK5
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Fuel-injection tanks kits,1969 Camaro/Firebird, notched, kit
Part Number: CLP-CM69NCFIT-K
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2026 if ordered today
Estimated Ship Date: Nov 24, 2026 if ordered today
Intake Manifold, Single Plane, Aluminum, Natural, Square Bore, Chevy, Small Block, Each
Part Number: DRT-42411001
Not Yet Reviewed
Estimated Ship Date: Feb 4, 2027 if ordered today
Estimated Ship Date: Feb 4, 2027 if ordered today
Connecting Rod, Compstar, Forged 4340 Steel, H-Beam, 6.000 in. Length, ARP 2000, Cap Screw, Chevy, Small Block, Each
Part Number: CPI-6000DS2A2AH1
Not Yet Reviewed
Estimated Ship Date: Apr 12, 2027 if ordered today
Estimated Ship Date: Apr 12, 2027 if ordered today
Rod Chevy Pro Sport H-Beam Arp 2000 7/16 Cap Screws 5.700 Lgt 2.100 Jrnl .927 Pin.940, 2-35057002100A-1
Part Number: SCA-6570021A-1
Not Yet Reviewed
Estimated Ship Date: Dec 30, 2026 if ordered today
Estimated Ship Date: Dec 30, 2026 if ordered today
Steering Box Kit: Nova 1962-67 Install Kit U-joint kit & Custom Color micro column w/mounting clamp
Part Number: FLA-FR302KT-CLR
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2026 if ordered today
Estimated Ship Date: Nov 6, 2026 if ordered today
Suspension Package, Pro-Touring Stage 2, Front Coil Springs, Shocks/Struts, Sway Bars, Chevy, Kit
Part Number: CLP-6267PTK-2
Not Yet Reviewed
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Suspension Package, Pro-Touring Stage 1, Lowering, Springs, Shocks/Struts, Sway Bars, Control Arms, Chevy, Kit
Part Number: CLP-6774PTK1
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Headers, Lakester, Jayster, Steel, Silver Ceramic Coated, Chevrolet, Small Block, Pair
Part Number: SNH-JAYSBCSEC
Estimated Ship Date: Jan 26, 2027 if ordered today
Estimated Ship Date: Jan 26, 2027 if ordered today
Headers, Zoomies, Steel, Polished Ceramic Coated, 1 7/8 in. Primary Tube, Chevy, Small Block, Pair
Part Number: SNH-ZOOMIESBCSEC
Estimated Ship Date: Feb 4, 2027 if ordered today
Estimated Ship Date: Feb 4, 2027 if ordered today
Suspension Package, Pro-Touring Stage 2, Lowering, Springs, Shocks/Struts, Sway Bars, Control Arms, Chevy, Kit
Part Number: CLP-6774PTK-2
Estimated Ship Date: Nov 23, 2026 if ordered today
Estimated Ship Date: Nov 23, 2026 if ordered today
Suspension Package, Grand Slam, Chevy, GMC, Kit
Part Number: CLP-6770GSK6DMOD
Estimated Ship Date: Nov 25, 2026 if ordered today
Estimated Ship Date: Nov 25, 2026 if ordered today
Disc Brakes, Rear, Cross-drilled/Slotted Surface Rotors, 1-piston Calipers, Parking Brake Provision, Chevy, Kit
Part Number: CLP-6872RWBKP12
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Disc Brakes, Front and Rear, Power Assist, Solid Surface Rotors, 1-piston Calipers, Front Spindles, Master Cylinder, Chevy, GMC, Kit
Part Number: CLP-6770FRBK-5
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Disc Brakes, Front, 1-Piston, Cast Iron Calipers, Solid Surface Rotors, Dropped Spindles, Chevy, Kit
Part Number: CLP-6366GSK5DMOD
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Suspension Package, Grand Slam, Chevy, GMC, Kit
Part Number: CLP-6366GSK-6S
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Suspension Package, Grand Slam, Chevy, GMC, Kit
Part Number: CLP-6770GSK-5S
Not Yet Reviewed
Estimated Ship Date: Dec 7, 2026 if ordered today
Estimated Ship Date: Dec 7, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster