Availability
CHEVROLET 5.3L/327 Summit Racing Parts and Accessories
Wiring Harness,Transistor Ignition Replacement Module Restoration , GM , Each
Part Number: SUM-RP20790
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance, set
Part Number: SUM-663HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Fuse Junction Block, Single Post Connector, Plastic, Chevy, Pontiac, Each
Part Number: SUM-RP23095
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Heater Cores, Classic OEM, Copper/Brass, Natural, Chevrolet, Each
Part Number: SUM-382209
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
1963-66 Chevy Truck , Forward Lamp Harness , With Gauges , Restoration , Chevrolet , Each
Part Number: SUM-RP20657
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
1969-70-72 Chevy Truck , Air Conditioning Harness , Includes Heater Wiring , Restoration , Chevrolet , Each
Part Number: SUM-RP20528
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Engine Harness, 1965-66 Impala, With H.E.I, 283 & 327 C.I., With Gauges, A/C, Each
Part Number: SUM-RP23256
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Wiring Harness, Rear Lamp Wiring Harness, OEM Replacement, Restoration,Chevy, Each
Part Number: SUM-RP21634
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Combo, Fel-Pro, Gaskets, Header, Steel Core Laminate, Stage 8, Bolts, Hex, Locking, Chevy, Small Block, Kit
Part Number: CMB-05-0091
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Ignition Starter Switch, Stock Style, Steel/Plastic, Black, Chevrolet, GM#1116712 , Each
Part Number: SUM-RP20356
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
1962-65 Nova , 60-66 Chevy Trk , 60-66 Corvair , 63-66 Corvette , 59-62 Impala , Steering Column Adapter Harness , For 1969-74 GM & Ididit Columns
Part Number: SUM-RP20773
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Ground Strap, 1967-69 Chevelle, El Camino, V8, Kit
Part Number: SUM-RP22377
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Frame Brace, Mid Frame, Chassis Stiffening, Steel, Natural, 1964-67 GM A-Body, Weld In, Kit
Part Number: SUM-770831
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Spark Plug Wire Set, Musclecar, 7mm, Silicone/EDPM, 90 Degree Boots, Dated 1969 Q2, Under Valve Cover, Chevrolet, Small Block Gen I, Set
Part Number: SUM-868511
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Fuel Tank Filler Hose, 1969-81 Blazer/Jimmy/Suburban, Repl GM#6274092, Each
Part Number: SUM-RP23741
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Engine Harness-HEI, Small Block 283, 327, Standard Length, Restoration, Chevy, Each
Part Number: SUM-RP20646
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Summit Precision Cam Bearings, SB Chevy aftermarket blocks with 1.999/2.001 on all five bores
Part Number: SUM-5C3346CS
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Valve Covers, Circle Track, Tall, Steel, Zinc, Plain, Chevy, Small Block, Pair
Part Number: SUM-G3289
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Summit Racing™ Restoration Fuel Sending Units for 1965-1967 CHEVELLE, 1965-1966 IMPALA - SUM-RP21705
Summit Racing™ Restoration Fuel Sending Units for 1965-1967 CHEVELLE, 1965-1966 IMPALA - SUM-RP21705
65-66 Chevelle , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 5/16 in. Fuel Line, Chevy, GM#6428067 , Each
Part Number: SUM-RP21705
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
1969-1972 Chevy Truck , Rear Lamp harness , Rear, Panel & Suburban, (2 Required Per Vehicle) , Restoration , Chevrolet , Each
Part Number: SUM-RP20748
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Shocks, Drag Race, 70/30 Series, Stock Ride Height, 13.440 in. Extended Length, Front, Buick, Chevrolet, GMC, Oldsmobile, Pontiac, Each
Part Number: SUM-722004
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6811G
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Fuel Tank Straps, Black EDP Coated, Chevy, Pontiac, Passenger Car, Pair
Part Number: SUM-255206
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Wiring Harness, Rear Lamp Harness, Without Backup Lamps, Restoration, Coupe, Corvette, Chevrolet, Each
Part Number: SUM-RP21034
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Brake Boosters, Power, Vacuum Dual Diaphragm, Steel, Zinc Finish, 8.00 in. Diameter, Chevy, GMC, Each
Part Number: SUM-760234
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster