Availability
CHEVROLET 5.3L/325 Summit Racing Parts and Accessories
Radiator/Fan Shroud Combo, LS Swap, Crossflow, Dual-Row, Aluminum, Natural, Transmission Cooler, 33.25 in. Wide, 19.00 in. High, 3.00 in. Thick, Kit
Part Number: SUM-381444-KIT1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Oil Pan, Steel, Spin-On Filter, Black Powdercoated, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612B-K
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiator/Fan Shroud Combo, LS Swap, Crossflow, Dual-Row, Aluminum, Natural, Manual, 26.24 in. Wide, 18.63 in. High, 3.00 in. Thick, Chevy, Kit
Part Number: SUM-381442-KIT1
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Engine Gasket Sets, Chevrolet LS, Gen III, Set
Part Number: SUM-G2631
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Throttle Body, 92mm Bore Size, MPI, Billet Aluminum, Black Anodized, Chevy, LS, Each
Part Number: SUM-227100B
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
LS Coolant Steam Crossover Kit, Four Corner LS Steam Vent Kit, Stainless Steel Hardlines with Black Anodized Steam Port Adapters, Chevy, LS, Kit
Part Number: SUM-220959X
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 3 Pro LS Truck Swap Cam, 222/232 112+5, .550/.550 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2L LS1 LS2 LS6 LS3 LS7 LS9 LSA LQ4 LQ9 LH6 LM7, Each
Part Number: SUM-8713R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 3 Pro LS Cam 232/242 113+3, .600/.600 Lift, 3-bolt, Excellent Power and Torque, 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8708R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Timing Chain and Gear Set, True Double Roller, Billet Steel, 3 Bolt, No Cam Sensor, Chevy, LS Series, Set
Part Number: SUM-G6602R-B
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Automatic Transmission, GM Bellhousing, Automatic Valve Body, Standard Shift Pattern, Chevy, 4L60E, 4WD, Aluminum Pan, LS, Each
Part Number: SUM-700464
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Engine Mounts, Motor Mount Plate, Bolt-In, LS Conversion, Adjustable, Steel Bracket, Black Powdercoated, Pair
Part Number: SUM-7731100
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Spark Plug Wires, White Ceramic, Spiral Core, 8mm, Black, 135 Degree Boots, GM, Saab, Isuzu, Hummer, Set
Part Number: SUM-881102
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-8707R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Single Roller, Billet Steel Sprockets, 3-Bolt, 1X Cam, Chevy, LS1, LS2, Set
Part Number: SUM-G6640
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cylinder Head Fasteners, Bolt, 2004+ Chevrolet LS, Hex Head, Steel, Zinc Plated, Kit
Part Number: SUM-910211
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, LS1 LS2 LS6 LS7 LS9 LS3 LH6 LQ4 LQ9, Each
Part Number: SUM-8712R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Ignition Coils, Coil Pack, Epoxy, Square, Red, LS, V8, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Set of 8
Part Number: SUM-850504R
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Valve Springs, Drop in, 0.600 Max Lift, Single Beehive, 1.290 in. O.D., 310 lbs./in. Spring Rate, 1.800 in. Installed Height, Set of 16
Part Number: SUM-174004
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Ignition Coils, Coil Pack, D585 Style, Epoxy, Round, Red, LS, V8, Chevy, Cadillac, GMC, Buick, Hummer, Isuzu, Set of 8
Part Number: SUM-850501R
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, Maximum Torque for Towing, 205/217 112+2, .500 /.500 Lift, 3-bolt, 4.8, 5.3, 6.0, 6.2
Part Number: SUM-K8718R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362258
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Timing Chain and Gear Set, Adjustable, Billet Steel, Single Roller, 3-Bolt, 4X, Standard Spacing, LS, Kit
Part Number: SUM-G6647-4X
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Rod Bearings, Direct Replacement, Standard Size, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171000
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Main Bearings, Bi-Metal, Silicon Aluminum, Standard Size, GM Gen III/IV LS, Set of 5
Part Number: SUM-172300
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster