Availability
Showing In Stock Items. Show All 144 Items.
Fuel Tank, EFI-Ready, 18 Gallons, Under Bed Frame Mount, Steel, Silver Powdercoated, Fuel Pump, Sending Unit, Chevrolet, GMC, Kit
Part Number: TNK-S0006
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
BUILD IT WITH SUMMIT!
Combo, Edelbrock 600cfm, Performer EPS, Fel-Pro, Summit Bolts, Summit Air Cleaner, Studs, Chevy, Kit
Part Number: CMB-03-0077
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor and Manifold Combo, Performer EPS Manifold, 650 cfm AVS2 Carb, Chevy, Small Block, Kit
Part Number: EDL-2021
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, Slayer Series, 750 cfm, Square Bore, Vacuum Secondary, Electric Choke, Polished, Each
Part Number: QFT-SL-750-VS
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Chrome Plasma Coated, Square Bore, Chevy, Small Block, Each
Part Number: EDL-7501-CP
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, HR-Series, Gasoline, 680 cfm, 4-Barrel, Square Bore, Vacuum Secondaries, Electric Choke, Each
Part Number: QFT-HR-680-VS
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, Street Demon, 750 cfm, 4-Barrel, Square Bore/Spread Bore, Electric Choke, Composite Bowl, Each
Part Number: DEM-1904
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Fuel Pump, Sniper OE Style 255 LPH EFI Fuel Pump Module, Electric In-Tank, 58 psi, 12 V, Gas, Buick, Chevrolet, Oldsmobile, Pontiac, Each
Part Number: SNE-12-302
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Black, Square Bore, Chevy, Small Block, Each
Part Number: EDL-75013
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Fuel Tanks, Sniper, 18 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Truck, Kit
Part Number: SNE-19-185
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, Street Demon, 750 cfm, 4-Barrel, Square Bore/Spread Bore, Electric Choke, Aluminum Bowl, Each
Part Number: DEM-1903
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, HR-Series, Gasoline, 650 cfm, 4-Barrel, Square Bore, Mechanical Secondaries, Electric Choke, Each
Part Number: QFT-HR-650
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, HR-Series, Gasoline, 780 cfm, 4-Barrel, Square Bore, Vacuum Secondaries, Electric Choke, Each
Part Number: QFT-HR-780-VS
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifold, Street Tunnel Ram, Aluminum, Natural, Dual Square Bore, Chevy, Small Block, Each
Part Number: EDL-7110
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, Slayer Series, 600 cfm, 4-barrel, Square Bore, Vacuum Secondary, Electric Choke, Tumble Polished, Each
Part Number: QFT-SL-1957E
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Fuel Tank, Steel, Silver Powdercoated, EFI Swap, 440 lph, 20 Gallons, Bed Fill Location, Chevy, GMC, Kit
Part Number: FIF-58148
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifolds, Fuel Injected, EFI, Multi-port, Aluminum, Natural, Single-plane, Plenum, 4150 Square Bore Mounting Flange, Chevy, Small Block, Each
Part Number: HLY-300-260
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, Street-Q, 650 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-650
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Black Plasma Coated, Square Bore, Chevy, Small Block, Each
Part Number: EDL-7501-BP
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifolds, EFI, Vortec Intake, Multi-port, 2,500-7,500 RPM Range, Cast Aluminum, Satin Finish, 4150 Flange, Fuel Rails, Chevy, 4.3-6.6L, Each
Part Number: HLY-300-263
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Carburetor, HR-Series, Gasoline, 750 cfm, 4-Barrel, Square Bore, Mechanical Secondaries, Electric Choke, 7/8 in.-20 Inlets, Tumble Polished, Each
Part Number: QFT-HR-750
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Intake Manifold, Performer RPM Air Gap, Dual Plane, Aluminum, Polished, Square Bore, Chevy, Small Block, Each
Part Number: EDL-75011
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 350 lph, Gasoline, Buick, Chevy, Olds, Pontiac, Each
Part Number: SNE-12-372
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
EFI Fuel Tank, 20 Gallon, Steel, Silver Powdercoated, 1961-1964, Chevrolet, Bel Air, Biscayne, Impala, Kit
Part Number: TNK-TM31-T-KIT
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Fuel Tank, Steel, Silver Powdercoated, EFI Swap, 340 lph, 20 Gallons, Side Fill Location, Chevy, GMC, Kit
Part Number: FIF-58049
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.