Availability
Engine Dolly, Steel, Black Powdercoat, Wheels Included, GM LS 99-on 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-910058
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
BUILD IT WITH SUMMIT!
Camshaft Bearing Installation and Removal Tool, Cam Bearing Install, Chevy, LS, Each
Part Number: SUM-900131
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Engine Cradle, Dolly,Stand, 2-Piece, Heavy Duty, 850 lbs. Capacity, Steel, Black Powdercoated, 3 in. Casters, GM LS, Kit
Part Number: SUM-918032
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Engine Lift Plate, LS< Series GM, Gen III,IV,V, Steel, .250 in., Red Powdercoat, Each
Part Number: SUM-G1044R
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Crankshaft Damper Drill Pinning Fixture Tool, Harmonic balancer, Gen III/IV LS, LT, Kit each
Part Number: SUM-900341
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Wrench, Use 1/2 in. Ratchet, Chevy, LS1, Steel, Zinc Plated, Each
Part Number: SME-906008
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tool, Harmonic Balancer Installation Tool, Chevy GM, LS/LSX, Gen III/IV, Steel, Black, Each
Part Number: SUM-900135
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressor, Cathedral Port LS Cylinder Heads, Cylinder Head On, Steel, Chevy, Each
Part Number: TFS-90306
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pushrod Checker, Stainless Steel, 7.6 in. Max Length, 7.2 in, Min, Length, Ball Tip, Chevy LS non-raised runner, Not for LSA/LS9/LS7, 7/64 set screw
Part Number: SUM-PLCLS7276
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Engine Stand, Engine Block Adapter Plate, SBC,BBC,LS, Duramax, Billet Aluminum, Natural, Each
Part Number: SUM-918019
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Puller and Installation Tools, GM Harmonic Balancer Pullers, Chevrolet, Dodge, Jeep, Each
Part Number: OES-25264
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressor, Cylinder Head On, Chevy, LS3, LS9, L92, L99, Each
Part Number: TFS-90307
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Puller, 3-Jaw Puller, 4 Forcing Rods, 1 Forcing Screw, Kit
Part Number: OTC-6667
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
LS Crankshaft Damper Drill Pinning Tool, LS1, LS3, LQ4, LSX, LT1, Kit
Part Number: ICB-551917
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Primer Socket, Aluminum, Natural, 3/8 in. Drive, Chevy, LS, Each
Part Number: SUM-900330
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Alignment Tool, Installs Rear Main Seal, Chevy, LS, Each
Part Number: MRG-LSRC1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressor, Cylinder Head On, Steel, Black, Chevrolet, LS, Each
Part Number: PRO-67605
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Installation Tool, Chevy, Small Block LS, Kit
Part Number: PRO-66519
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Timing Cover Installation Tool, Crankshaft Seal Position, Chevy, Each
Part Number: MRG-LSTC1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pushrod Checker, Stainless Steel, 8.1. Max Length, 7.250 in, Min, Length, Ball Tip, Chevy LS Raised Runner Heads Only, 7/64 sets screw, Each
Part Number: SUM-PLCLSRR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Crankshaft Socket, 1/2 in., Steel, Chevrolet, LS1/LS6, Each
Part Number: SUM-904914
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressor, Cylinder Head On, Aluminum, Purple, Chevy, Small Block LS, Each
Part Number: PRO-67603
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Engine Port Block-Off Kits, Intake Port Block Off Plates, Chevrolet, Small Block LS, Kit
Part Number: ICB-551381
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
The Gen. 3 and 4 LS Cam Bearing alignment tool bolts to the front of the retaining plate and provides a guide for a cam bearing knocker.
Part Number: SUM-900105
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tester Adapter, Cooling System, Steel, Green, Chevy, Saab, Ford, GMC, Each
Part Number: SNN-3128
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.