Availability
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Chain and Gear Set, True Roller, Single Roller, BIllet Steel Sprockets, 3-Bolt, 4X Cam, Chevy, LS3, 6.2L, Set
Part Number: SUM-G6642
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Connecting Rods, SIR I-Beam, Forged 5140 Steel, 6.100 in. Length Center To Center, Chevrolet, Small Block LS, Set of 8
Part Number: ESP-SIR6100MLW
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Harmonic Balancer, Race Performance, Cadillac, Chevy, Pontiac, 5.7, 6.0, 6.2L, Each
Part Number: PBB-PB1117SS
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Crate Engine, GM 5.3L, LM7, 385 HP, Long Block, Internal Engine Balance, Aluminum Heads, Each
Part Number: HPE-HP97
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Block, SHP LS Next, Bare Block, 4.125 in Bore, 9.240 Deck, 4-Bolt Mains, Cast Iron, GM LS-Series, Each
Part Number: DRT-31867211
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Springs, Single, Beehive, 1.260 in. O.D., 285 lbs./in. Spring Rate, 1.150 in. Coil Bind Height, Set of 16
Part Number: BTC-SP011-16
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Covers, Tall Height, Cast Aluminum, Black Crinkle, Plain, Chevy, LS, Pair
Part Number: SUM-440362
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
1997-03 GM Gen.3 LS Head Bolts, Zinc Plated, Steel, Hex, Torque To Yield, Kit
Part Number: SUM-910210
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cam Bearings, Direct Replacement, Steel Backed Babbitt, Chevy, 4.8, 5.3, 6.0, 6.2, 7.0L, 2nd Design, Set
Part Number: CLE-SH2125S
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Lifters, Hydraulic Roller, Chevy, Set of 16
Part Number: CCA-875-16
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Cylinder Head, GenX® 260, CNC Competition Ported, Assembled, 70cc CNC Chambers, 450 Lb. Springs, GM LSX, Each
Part Number: TFS-32710002-C01
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Engine Oil Dipstick, GM LS Retrofit, Plastic Handle, Yellow, Steel Tube, Black Powdercoated, Chevy, Small Block, Each
Part Number: HLY-302-15
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-1
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 2618 Forged Pistons. 3.780 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273780-7
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Nano-Peened Dual Valve springs, Titanium retainers, 160 lbs. seat pressure. 425 lbs. open at .670 lift. LS1, LS6, LS2, LS3, LQ4, LQ9, L92, Kit
Part Number: TFS-2500287P
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-2F
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pistons, Pro Tru Street, Forged, Dome, 4.000 in. Bore, Chevy, 6.0L LS, Set of 8
Part Number: WIS-PTS523AS
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Rod Bearings, HP-Series, Standard Size, Bi-metal, Silicon Aluminum, Large Journal, Chevy, Small Block, Set of 8
Part Number: KGB-CR807HPN
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Bare Block, Cast Iron, LS Mains, 4.125 in. Bore, 9.24 in. Deck Height, Each
Part Number: DRT-31867212
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Lifter Guide, Plastic, Hydraulic Roller, Non-AFM/DOD, Chevrolet, LS, Each
Part Number: ADO-12595365
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Crankshaft, Remanufactured, Nodular Iron, 3.622 in. Stroke, 0.010 Undersize Bearing Required, 24-Tooth Reluctor, Chevy, LS, Each
Part Number: SUM-180362
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Main Bearings, XP-Series, Copper/Lead/Nickel, Standard Size, Chevy, 4.8, 5.3, 5.7, 6.0L, Set
Part Number: KGB-MB5013XPSTDX
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.