Availability
Starter Bolts, Stainless Steel, 3/8-16 x 3.760 in., Hex Head, Mini Starter, Chevy, Big, Small, Pair
Part Number: ARP-430-3502
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Universal Joint, Spicer 1350 Style, Greasable, Steel, Each
Part Number: SUM-732002
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Oil Pan Gasket, Multi-Piece, Cork/Rubber, Chevy, Small Block, Thin Seal, Each
Part Number: FEL-OS5197C2
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Head Gasket, PermaTorque, Chevy, Small Block, 400, Each
Part Number: FEL-8364PT
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Water Neck, Cast Metal, Chrome Plated, 45 Degree, Chevy, Big/Small Block, Each
Part Number: SUM-G3800
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Harmonic Balancer Bolt, Chromoly, Black Oxide, 12-Point, Chevy, Small Block, Each
Part Number: SUM-910258
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Bearing Race, Steel, 3.813 in. O.D., 0.625 in. Width, Outer Wheel, Each
Part Number: TMK-382A
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Timing Cover, 1-Piece, Steel, Chrome Plated, Chevy, Small Block, Each
Part Number: SUM-G3200
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Bellhousing Bolts, 12-point, 3/8-16 in. Thread, 8740 Chromoly, Black Oxide, 1.375 in. UHL, Chevy, Kit
Part Number: ARP-129-0902
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Switch, Replacement, Headlight Dimmer Type, Push Button, Buick, Chevy, Ford, GMC, Jeep, Olds, Pontiac, Each
Part Number: ADO-D808
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Rod Bearing, H Series, .010 in Crankshaft Undersize, TM-77, Chevy, Small Block, Each
Part Number: CLE-CB663HND10
Not Yet Reviewed
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Speedometer Cable, 69 in. Length, Female Threads, Black Jacket, Chevy, Each
Part Number: UPD-C477203
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Valve Guide, Phosphorous Bronze, Chevy, Small Block, Each
Part Number: BRO-SH545-11-32P
Not Yet Reviewed
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Rocker Arm Studs, 7/16-14 in. Base Thread, 3/8-24 in. Rocker Arm Nut Thread, Chevy, Small Block, Set of 16
Part Number: PIO-850001
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Valve Cover Bolts, Replacement, Hex, Steel, Chrome, 1/4-20 in. Thread Size, Chevy, 5.0L, 5.7L, Set of 8
Part Number: SUM-910218
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Oil Filter, Performance Gold, Canister, 4.78 in. Tall, 3.00 in. Diameter, 13/16 in.-16 Thread, Anti-Drainback, Spin-On, Each
Part Number: KNN-HP-2006
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Temperature Sender, Without Light, OEM Replacement, Buick, Cadillac, Chevy, GMC, Oldsmobile, Pontiac, Each
Part Number: SMP-TS6
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Engine Oil Dipstick, Passenger Side, Steel, Chrome, Tube, Buick, Chevy, GMC, Oldsmobile, Pontiac, Each
Part Number: SUM-G3864
Estimated Ship Date: Jul 14, 2025 if ordered today
Estimated Ship Date: Jul 14, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Fuel Pump Block-Off Plates, Zinc Alloy, Black Powdercoated, Chevy, Small Block, Each
Part Number: SUM-420010BK
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Rod Bearings, .010 in Crankshaft Undersize, Bi-metal, Silicon Aluminum, Chevy, Large Journal, Small Block, Set of 8
Part Number: KGB-CR807SI010
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Alternator Bracket, Steel, Black, Header Mount, Short Water Pump, Use with SUM-G4051B, Chevy, Small Block, Each
Part Number: SUM-G4050B
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Water Pump Gasket, SBC, Constructed of Cellulose Fiber Composition, Conforms to Mating Surface, Set of 10
Part Number: MOR-93231
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Universal Joint, Super Strength, 1344 Style, Greasable, Steel, Each
Part Number: MOG-235
Estimated Ship Date: Monday 6/23/2025
Estimated Ship Date: Monday 6/23/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.