Availability
Tank To Pump Line, Stainless, 5/16 in. Fuel Line Diameter, Chevy, GMC, Short Bed Stepside RWD Models, Each
Part Number: CST-CTF1003-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless, 5/16 in. Fuel Line Diameter, Chevy, GMC, Fits Short Bed Stepside Only, Each
Part Number: CST-CTF1005-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, Natural, 5/16 in. Fuel Line Diameter, Chevy, GMC, Fits Short Bed Models, Set
Part Number: CST-CTF1007-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, 5/16 in. Fuel Line Diameter, Chevy, GMC, Fits RWD Short Bed Models, Set
Part Number: CST-CTF1008-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long Bed Models, Set
Part Number: CST-CTF1009-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless, Natural, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long Bed Dual Tank Models
Part Number: CST-CTF1013-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long and Short Bed Dual Tank Models
Part Number: CST-CTF1015-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, Natural, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits 4WD Models Only, Set
Part Number: CST-CTF1016-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Line, Stainless Steel, Pump to Carburetor, Each
Part Number: CST-CTC1008-SS
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Diameter, Chevy, GMC, Fits Long Bed Models, Each
Part Number: CST-CTF1060-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Diameter, Chevy, GMC, Rear Half Only, Each
Part Number: CST-CTF1061-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Steel, 3/8 in. Diameter, Chevy, GMC, 5.0L, Fits Reg. Cab Short Bed Throttle Body Injected
Part Number: CST-CTF1064-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless, 3/8 in. Diameter, Chevy, GMC, 5.0L, Fits Reg Cab Short Bed Throttle Body Injected
Part Number: CST-CTF1064-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, 5.7L, Filter To Throttle Body, Set
Part Number: CST-CTF1068-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, Natural, 5/16 in. Diameter, Chevy, GMC, Set
Part Number: CST-CTF1085-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Fuel Line Diameter, Chevy, GMC, Each
Part Number: CST-CTF1027-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Long Bed Dual Tank Models
Part Number: CST-CTF1028-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Single Tank Models, Each
Part Number: CST-CTF1030-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Rear Section, Stainless, 3/8 in. Diameter, Chevy, GMC, Fits Short Bed Extended Cab, Each
Part Number: CST-CTF1034-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, Fits Long Bed Dual Tank Models, Set
Part Number: CST-CTF1037-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, Fits Short Bed Dual Tank Models, Set
Part Number: CST-CTF1039-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, Fits Regular Cab Long Bed, Set
Part Number: CST-CTF1044-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless, 3/8 in Diameter, Chevy, Fits Dual Tank Models with Throttle Body Injection, Set
Part Number: CST-CTF1049-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Line, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, Fits Extended Cab Models, Each
Part Number: CST-CTF1051-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, 3/8 in. Diameter, Chevy, GMC, Fits Short Bed Dual Tank Models, Set
Part Number: CST-CTF1053-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.