Availability
Connecting Rods, Big Block Max Plus Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.700 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6700BBMXP8
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, 400, V8, Set of 16
Part Number: ARP-134-6002
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, GM LS, Each
Part Number: ESP-FSI6125O-1
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.100 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-66100945
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, 4340 Steel, H-Beam, 6.300 in. Length, Cap Screw, Bushed, Chevy, Ford, Set of 8
Part Number: ESP-6300B3D
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.385 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-6638522
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, ESP 4340 Steel H-Beam, 6.000 in., Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: ESP-6000B3D2000
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy/Ford, Big Block, Set of 8
Part Number: ESP-67003D
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
5140 STEEL I-BEAM LS 6.1" .943" PIN 2000
Part Number: ESP-SIR6100N2000
Estimated Ship Date: Oct 14, 2025 if ordered today
Estimated Ship Date: Oct 14, 2025 if ordered today
Connecting Rods, H Beam, 6.700 in. Length, Chromoly 4340 Steel, 2.200 in, Journal Diameter, 0.990 in Floating Wrist Pin, ARP Cap Screws, Chevy BB, Set
Part Number: CPI-S0008
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rod Bolts, High Performance Series, Chromoly Steel, Chevy, 4.3L, V6, Set of 12
Part Number: ARP-133-6001
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.135 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-6613522A
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Connecting Rod, Ultra Enforcer, Forged 4340 Steel, I-Beam, Cap Screw, ARP L19, Bushed, 6.125 in. Length, Chevy, Small Block, LS, Set of 8
Part Number: CPI-U17175
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.000 in. Long, Chevrolet, Small Block, LT, Set of 8
Part Number: ESP-FSI6000B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Forged Pro SBC 4340 Forged Steel H-Beam Connecting Rods, 6.000 in. Length, .927 Floating Pin, ARP L19 260K 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-SBC600019H
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, Compstar, Forged, H-Beam, ARP Cap Screws, Bushed Pin, 6.100 in. Length, Chevy, Set of 8
Part Number: CPI-C6100DS2A2AH
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
5140 STEEL I-BEAM CHEV SB 5.700" 2.00"
Part Number: ESP-SIR5700SP-1
Not Yet Reviewed
Estimated Ship Date: Oct 14, 2025 if ordered today
Estimated Ship Date: Oct 14, 2025 if ordered today
Connecting Rods, Speedway Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.200 in. Long, Chevy, Small Block, Set of 8
Part Number: OLV-C6200STSW8
Estimated Ship Date: Oct 1, 2025 if ordered today
Estimated Ship Date: Oct 1, 2025 if ordered today
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Big Block, Set of 8
Part Number: ESP-68003D
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
5140 STEEL I-BEAM CHEV SB 5.700" PRESS
Part Number: ESP-SIR5700BP-1
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.385 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-26385
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rod, FSI I-Beam, Forged 4340 Steel, Shot-Peened, 6.135 in. Length, Chevy, Big Block, Set of 8
Part Number: ESP-FSI6135
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Wrist Pin Bushing, Bronze, 0.990 in. I.D., Chevy, Big Block, Each
Part Number: SCA-B990
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, Ultra, H-beam, 6.385 in. Length, Forged 4330 Steel, Shot-peened, Chevy, Big Block, Set of 8
Part Number: CPI-U16200
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.