Availability
Lifters, Hydraulic Roller, Chevy, Set of 16
Part Number: EDL-97384
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valves, Inconel, Exhaust, 1.600 in. Head Diameter, 0.315 in. Stem Diameter, 5.200 in. Length, Beadlock 1-Groove, Chevy, 6.0L, LS3, Set of 8
Part Number: AFR-7213-8
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 256/268, Lift .480/.485, Chevy, Big Block, Each
Part Number: CCA-11-234-3
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valves, Intake, Stainless Steel, 2.250 in. Diameter, .341 in. Stem, 5.244 in. Length, Chevy, Ford, Set of 8
Part Number: MAN-11802-8
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Camshaft, Hydraulic Flat Tappet, Duration 268 Int./276 Exh., Lift 0.525 Int./0.525 Exh., Lobe Separation 110, Chevy, BBC, 396-454, Each
Part Number: CCA-11-306-5
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Rocker Arms, Heavy-Duty, Full Roller, Stud, 1.6 Ratio, Aluminum, Orange, Chevy, Small Block, Set of 16
Part Number: CSP-SH1005
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 462 lbs./in. Spring Rate, Machined Factory Valve Guides, Kit
Part Number: BTC-SK004-T-6560
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Pro SBC Hyd. Roller Cam, Turbo Stage 4, 242/242 Duration, 117.5 LSA + 9.5 Adv., 550/550 Lift with 1.5 Ratio, .587/.587 1.6 Ratio, 3500-7400 Rpm Range
Part Number: SUM-8808
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 290/298, Lift .598/.598, Chevy, Big Block, Kit
Part Number: CCA-CL11-679-5
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 276/283, Lift .530/.524, Chevy, Big Block, Each
Part Number: CCA-11-670-4
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Pro SBC Stage 7 Hyd. Flat-Tappet 4/7 Firing Order Swap, 248/256 Dur., 108 LSA + 2 Adv, .518/.525 1.5 Ratio, 3000-7000 Range
Part Number: SUM-K1206
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Pro SBC Stage 8 Hyd.Flat-Tappet 4/7 Firing Order Swap, 252/258 Dur., 107 LSA + 1.5 Adv, .533/.540 1.5 Ratio, 3200-7200 Range
Part Number: SUM-K1207
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Mechanical Flat Tappet, Advertised Duration 268/274, Lift .488/.501, Chevy, Small Block, Each
Part Number: CCA-12-676-4
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
BTR GEN V 4" STROKE SUPERCHARGED CAMSHAFT
Part Number: BTC-S0416
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Camshaft, Hydraulic Roller Tappet, 288/300 Advertised Duration, .501/.510 in. Lift, Chevy, Big Block, Each
Part Number: MEL-22141
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
CAMSHAFT
Part Number: MEL-MC1436
Not Yet Reviewed
Estimated Ship Date: Oct 1, 2025 if ordered today
Estimated Ship Date: Oct 1, 2025 if ordered today
Camshaft, Hydraulic Flat Tappet, Advertised Duration 254/262, Lift .505/.505, Chevy, Big Block, Each
Part Number: CCA-11-231-3
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain, Single Roller, Replacement, Chevrolet, Small Block, LS, Each
Part Number: CLO-9-302
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 269/276, Lift .495/.503, Chevy, LT1/LT4, Each
Part Number: CCA-07-502-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 258/262, Lift .458/.458, Chevy, Small Block, Each
Part Number: CCA-08-409-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/284, Lift .474/.474, Chevy, Small Block, Each
Part Number: CCA-08-414-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 276/282, Lift .503/.510, Chevy, Small Block, Each
Part Number: CCA-12-418-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 288/294, Lift .521/.540, Chevy, 454, Each
Part Number: CCA-01-421-8
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Valves, Intake, Stainless Steel, 2.080 in. Diameter, .341 in. Stem, 5.140 in. Length, Chevy, Set of 8
Part Number: MAN-11858-8
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
Camshaft, HV NSR, Hydraulic Roller, 3-Bolt, Chevy, LS, Each
Part Number: CCA-54-271-11
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.