Availability
Piston Rings, Moly, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K30
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Moly, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Moly, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K40
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rod Bearings, A-Series, Bi Metal, Standard Size, Chevy, Small Block, Set of 8
Part Number: SLP-8-2555A
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Cast Iron, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Moly, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K60
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Main Bearings, Standard Size, Tri Metal, 1/2 Groove, Chevrolet, Small Block, Set of 5
Part Number: SLP-4663M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam Bearings, Direct Replacement, Steel Backed Babbit, Chevy, Small block, Set
Part Number: SLP-1235M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pump, Standard-Volume, Standard-Pressure, Chevy, Small Block, Each
Part Number: SLP-224-4146
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Cast Iron, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X30
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rod Bearings, Standard Size, Tri Metal, Small Journal, Chevy, Small Block, Set of 8
Part Number: SLP-8-2020CP
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rod Bearings, Standard Size, Tri Metal, Chevy, Small Block, Set of 8
Part Number: SLP-8-2555CP
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, 4.020 in. Bore, 5/64, 5/64, 3/16, .200 in. Deep Oil Groove, Moly Top Ring, Set
Part Number: SLP-E-251K20
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Cast Iron, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X40
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Main Bearings, Standard Size, Bi Metal, 1/2 Groove, Chevy, Big block, Set of 5
Part Number: SLP-4400MA
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pump, High-Volume, Standard Pressure, Chevy, Small Block, Each
Part Number: SLP-224-4143
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Lifter, Hydraulic Roller, Chevy, GMC, Each
Part Number: SLP-HT-2279
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Cast Iron, 4.250 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-233X
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Rings, Moly, 3.736 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 0.200 in. Deep Oil Ring Groove, 8-Cylinder, Set
Part Number: SLP-E-356K
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam Bearings, Direct Replacement, Steel Backed Babbit, Chevy, Big Block, Set
Part Number: SLP-1404M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Main Bearings, .010 in. Over Size, Tri Metal, 1/2 Groove, Chevrolet, Small Block, Set of 5
Part Number: SLP-4663M10
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam Bearings, Direct Replacement, Steel Backed Babbit, Chevy, LS, 1st design, Set
Part Number: SLP-1888M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam Bearings, Steel Backed Babbitt, Chevy, Set
Part Number: SLP-1923M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam Bearings, Direct Replacement, Bi-metal Aluminum, Chevy, Small Block, Set
Part Number: SLP-1749M
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.