Availability
Trunnion Upgrade Kit for GM LS7 and Gen V LT1, Set of 16
Part Number: CCA-13704-KIT
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain Cover, Aluminum, Polished, Chevy, GEN V, 7.4L, Each
Part Number: TRD-6042
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve Springs, Freedom Series, Single, 1.260 in. O.D., Steel Retainers, Locks, Valve Seals, Kit
Part Number: PMX-7070
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Set, Single Roller, Steel, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Saab, Kit
Part Number: CLO-9-4205SA
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Gear Drive, Dual Idler, Chevy, Small Block, Use with Flat Tappet or Retrofit Roller Camshaft, Set
Part Number: CCA-4100
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, Hex-A-Just Roller, Single Roller, Chevy, 4.8/5.3/6.0L, Set
Part Number: CLO-9-3158A
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .467/.467, Chevy, Small Block, Each
Part Number: SUM-1788
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 268/280, Lift .515/.520, Chevy, Big Block, Each
Part Number: CCA-11-242-3
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain Cover, Aluminum, Polished, Chevy, GEN VI, 7.4L, Each
Part Number: TRD-6043
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 313/328, Lift .508/.533, Chevy, Small Block, Each
Part Number: SUM-1108
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 253/263, Lift .420/.442, Chevy, 2.8L V6, Kit
Part Number: EDL-3790
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, .544/.553 1.6 Ratio, 2600-6600 Range
Part Number: SUM-1205
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Cover, 1-piece, Aluminum, Natural, Buick, Each
Part Number: ATP-103005
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, Original True Roller, Single Roller, Iron/Steel Sprockets, Chevy, 350, 5.7L, Set
Part Number: CLO-9-3157
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Lifter, set of 16, .842 dia, .700" wheel, Hydraulic Roller, Drop-In, LS
Part Number: CXM-LS039111102
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .443/.443, Chevy, Small Block, Each
Part Number: SUM-1069
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain, Replacement, Single Roller, Steel, Chevy, Small Block LS, Each
Part Number: CLO-9-303
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rocker Arm Studs, High Performance, 5/16-24 in. Thread, 1.00 in. Effective Stud Length, Kit
Part Number: ARP-234-7208
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft Installation Kit, 3-Bolt, Steel Sprocket, Use When Replacing Single-Bolt Cam with 3-Bolt, Chevy, Kit
Part Number: LPE-L200175307
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, Original True Roller, Double Roller, Iron/Steel Sprockets, Chevy, Big Block, Set
Part Number: CLO-9-3110
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rocker Arms, Roller Tip, Self-Aligning, Cast Steel, 3/8 in. Stud Mount, 1.5 Ratio, Polylocks, Chevy, Small Block, Set of 16
Part Number: SUM-141700PL
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 292/292, Lift .501/.501, Chevy, Small Block, Each
Part Number: CCA-12-213-3
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 256/268, Lift .447/.454, Chevy, Small Block, Each
Part Number: CCA-12-234-2
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, Billet, Double Roller, Billet Steel Sprockets, Chevy, V6/V8, 4.3L/5.7L, Set
Part Number: CLO-9-3545X9
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set
Part Number: TFS-41478510
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.