Availability
CHEVROLET Summit Racing Parts and Accessories
Freeze Plugs, Brass, Chevy, Small Block, Kit
Part Number: SUM-G1581
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Wheel, Venom, Aluminum, Gloss Black, Polished Lip, Machined Accents, 15 in. x 8 in., 5 x 4.75 in./120.65mm Bolt Circle, 4.50 in. Backspace, Each
Part Number: SUM-149P-58610
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Crankshaft Damper Drill Pinning Fixture Tool, Harmonic balancer, Gen III/IV LS, LT, Kit each
Part Number: SUM-900341
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Combo, Aluminum, Cylinder Heads, Manifold, Cam/Lifters 528/539, Gaskets, Bolts, SB Chevy
Part Number: SME-K-415-405
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiator, Performance Fit, 4-Row, Aluminum, Polished, Chevy, Each
Part Number: SUM-384011
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, 1800-6250 RPM Range
Part Number: SUM-K1222
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Oil Pan, Steel, Gold Zinc, 7 qt., Chevy, Big Block, Each
Part Number: SUM-G36012
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, 550 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180371P
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Water Pump, Mechanical, Long, High-volume, Clockwise, Aluminum, Natural, Chevy, Big Block, Each
Part Number: SUM-310126
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Pump, Mechanical, 110 gph, 8 psi, 3/8 in. NPT, Chevy, Big Block, Each
Part Number: SUM-250022-1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Blue, 90 Degree Spark Plug Boots, SBC HEI, Over Valve Covers, V8, Set
Part Number: SUM-868836
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiator, Performance Fit, 3-Row, Aluminum, Polished, Chevy, GMC, Each
Part Number: SUM-384017
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Hydraulic Roller Lifter Installation Hardware, Chevy, Small Block, 5.0/5.7L Kit
Part Number: SUM-150123
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Headers, Long Tube, Steel, Ceramic Coated, Chevy, Big Block, Pair
Part Number: SUM-G9102
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Radiator, Performance Fit, 3-Row, Aluminum, Polished, Chevy, Car, V8, Each
Part Number: SUM-384035
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Torque Converter, Pro LS, 11.8 in. Diameter, Chevy LS, 4L80E, 2.650 in. Hub Height, 2,600-2,800 Stall, Each
Part Number: SUM-700347
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Flexplate, 168-Tooth, Internal Engine Balance, SFI 29.1, Chevy, GM LS Gen III/IV, Each
Part Number: SUM-G105SFI
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Headers, Long Tube, Steel, Painted, Chevy, Big Block, Pair
Part Number: SUM-G9010
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Brake Kit, Drum to Disc Conversion, Solid Vented Rotors, Calipers, Rear, Chevy, Pontiac, Kit
Part Number: SUM-BK1622
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Throttle Body, 102mm Bore Size, MPI, Billet Aluminum, Black Anodized, Chevy, LS, Each
Part Number: SUM-227102B
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Main Studs, 12-Point, Chromoly, Black Oxide, 6-bolt, Chevy, LS, Kit
Part Number: SUM-910500
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Valve Cover Gaskets, Rubber with Steel Core, Chevy, Big Block, Pair
Part Number: SUM-G2311
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.000 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-00
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster