Availability
Motor Mount, Fabricated, GMT-900, LS Truck, Heavy Duty,Performance, Safety Upgrade, Urethane/Steel, Black powdercoat, Pair
Part Number: SUM-7731112-R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Electric Fan, Single, 16 in. Diameter, Reversible, Curve Blade, 1,746 cfm, Black, Plastic, Each
Part Number: SUM-381120
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Turbocharger, S475 Turbo, 75mm Inducer Size, 96mm Exducer Size, T6 Twin Scroll, 1.32 A/R, Journal Bearing, Each
Part Number: SUM-260050
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Thermostat, 160 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Chevy, Pontiac, GMC, LS, Each
Part Number: SUM-365-160
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
V Band Clamp, Interlocking, Stainless Steel, Natural, 3.5 in. O.D. Pipe, Kit
Part Number: SUM-694350
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Battery Box, Plastic, Black, 13.500 in. Length, 11.000 in. Width, 9.500 in. Height, Each
Part Number: SUM-G1231
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Lifter, Mechanical, Flat Tappet, Chevy V8, Set of 16
Part Number: SUM-HT99216
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Overflow Tank, 34 oz., Cylindrical, Stainless Steel, Polished, Recirculating, 3 in. Diameter, 10 in. Length
Part Number: SUM-300103
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Chain and Gears, True Roller, Double Roller, Steel Sprockets, Chevy, 262 V6, 305, 350, 87' up Factory Roller Cam, 9 Keyway, Set
Part Number: SUM-G6601R-9
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Engine Swap, Cast Aluminum, Black, 6.0 Quart Capacity, 4.25 in. Stroke Clearance, Chevy, LS, V8, Each
Part Number: SUM-121200B
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Crossmember, Transmission, Steel, Black, 700R4, 200-4R, TH350, TH400, Powerglide, Each
Part Number: SUM-770308
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Lift Sling, .250 In. Steel Plate, Adjustable Location, 24 in. Nylon Straps, 1,200 lb. Capacity, Each
Part Number: SUM-905235
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Long Tube, Steel, Ceramic Coated, Pontiac, 326-455, D-Port, Pair
Part Number: SUM-G9120
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cylinder Heads, Race Porting, Aluminum, Assembled, 58cc Chamber, 205cc Intake, Ford, Small Block, Pair
Part Number: AFR-1450
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Radiator, Classic OEM, Downflow, Copper/Brass, Black, 2-Row, Jeep, Each
Part Number: SUM-382007
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Chain, Single Roller, Chevy, LS2, Fits All Gen. 3/4 LS with Wet Sump oiling, Each
Part Number: SME-143012
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 274/274, Lift .450/.450, Chevy, Small Block, Kit
Part Number: SUM-K00172
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Tubing, Fuel and Brake Hard Line, 316L Stainless Steel, Polished, 3/8 in. x 25 ft., Each
Part Number: SUM-220208-25X
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Variable Valve Timing VVT Delete Combo, Cam Bolts, 3-bolt Cam Sprocket, Timing Cover, Damper Bolt, Chevy, 4.8L, 5.3L, 6.0L, 6.2L, Kit
Part Number: CMB-09-0027
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Water Pump, Electric, 35 gpm At 12 V, 6 amps, Aluminum, Black Powdercoated, Chevy, Small Block, Each
Part Number: SUM-316000
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Oil Accumulator, Marine, 2 Quarts, 12 in. x 4.25 in., Aluminum, Blue, Gauge, Hardware, Valve, Kit
Part Number: CTR-24-126
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pistons, Hypereutectic, Flat, Coated Skirt, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-30
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Race Ramps, Restyler Ramps, 5-piece, 10.4 Degree, 14 in. Tall, Pair
Part Number: BTI-RR-RESTYLE16
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.