Availability
Fuel Filter, Inline Mount, Aluminum, Black, 40 Microns, -6 AN Male Inlet/Outlet, Each
Part Number: SUM-230102
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Brake Proportioning Valve, Fixed, Dual Inlet, 3 Outlets, Brass, Natural, Front Disc Brakes, Each
Part Number: SUM-760186
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Tire, Drag Slick, 28.00 x 10.00-17, Bias-Ply, Solid White Letters, D06 Compound, Each
Part Number: HOO-18157
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Radiator, Classic OEM, Downflow, Copper/Brass, Black, 3-row, Jeep, Each
Part Number: SUM-382008
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Steering Universal Joint, Steel, Chrome, 3/4 in. 36-Spline, 3/4 in. DD, Each
Part Number: SUM-760667
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Exhaust Clamp, Band-Style, Butt Joint, 2.50 in. Diameter, 304 Stainless Steel, Polished, Each
Part Number: SUM-683250
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Hydraulic Roller Lifter Installation Hardware, Chevy, Small Block, 5.0/5.7L Kit
Part Number: SUM-150123
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Spring Upgrade Kit, 1.300 OD Dual Springs, Retainers/Locks, Seals, All GM LS LS1, LS2, LS3, LS7, LSA, LS9, LQ4, LQ9, L92, L76, LY6
Part Number: SME-174003
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Throttle Cable Bracket, Billet Aluminum, Black Anodized, Summit M2008, Holley 4150/4160, Each
Part Number: SUM-210239BLK
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Tire Pressure Gauge, Digital, 0-150 psi, Ball Chuck, Bleed Valve, 22.0 in. Hose, Case, Each
Part Number: ICP-360049
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Distributor, HEI, Magnetic Pickup, Mechanical, Vacuum Advance, Blue Cap, Ford, 221-302, Each
Part Number: SUM-850021
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Traction Bar, CalTrac Low Pro, Steel, Black Powdercoated, Chevy, Pontiac, Kit
Part Number: CLV-2301
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Stand, H-Shape, Weight Capacity 1,000 lbs., 63:1 Geared, 360 Degrees head, Steel, Red Painted, Each
Part Number: SUM-908300GA
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Long Tube, 1-5/8 in. Primaries, 3.0 in. Collectors, 304 Stainless Steel, Chevy, Small Block, Pair
Part Number: SUM-G9101-SS
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Shorty, Steel, Ceramic Coated, Chevy, GMC, Pickup, SUV, 5.0L, 5.7L, Pair
Part Number: SUM-G9014-9
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Water Neck, Cast Aluminum, Polished, O-Ring, 90-Degree, Chevy, Big/Small Block, Each
Part Number: SUM-371101
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Servo Piston Complete Drop in Assembly, Corvette Servo, 2nd/4th Gear , GM, 700R4, 4L60E, 4L65E, 4L70E, Complete drop in Kit
Part Number: SUM-705415-K
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Starter, Mini, Inline, Oldsmobile, Pontiac, V8, Each
Part Number: SUM-820311
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Line, Chrome, Steel, Holley, 4150, 3/8 in. Hose Barb Inlet, 1/8 in. Gauge Port, Each
Part Number: SUM-G3100
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Seat, 55 Series Pro Street Drag, Highback Bucket, 18 degree Layback, Aluminum, Natural, 18.50 in. Width, Each
Part Number: KIR-55185
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Stage 1, Kit
Part Number: CMB-09-0039
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Rod Bearings, Direct Replacement, Standard Size, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171000
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro SBC Stage 2 Hyd. Roller Cam, 212/218 Dur., 112 LSA + 0 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio,1500-6000 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-8801
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-8707R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.