Availability
1997 DODGE 5.2L/318 Differential & Rear-End Components
Showing In Stock Items. Show All 757 Items.
Not Showing Customizable Items. View Customizable Items.
Differential Covers, Differential Cover Kits, Dana 44, 10-bolt, Nodular Iron, Silver Hammertone Powdercoated, Bolts, Gaskets, Kit
Part Number: SDH-10023536
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
BUILD IT WITH SUMMIT!
Clutch Kit, Street-Strip Performance, 1 in. Shaft, 23-Spline, 11 in. Organic/Ceramic Disc, Mopar, Kit
Part Number: SUM-700920
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential, Eaton Detroit Truetrac, 31-Spline, Chrysler 9.25 in., Each
Part Number: ETN-913A368
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier, Dura Grip, Limited Slip, Steel, Rear, Chrysler 9.25 in., Each
Part Number: YGA-26019
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential, Electric Locker, 30-Spline, Dana 44, 3.92 and Numerically Higher Ratios, Each
Part Number: ETN-19969-010
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Pinion Bearing Spacer, Crush Sleeve Eliminator, Steel, Chrysler 9.25 in., GM 8.5 in., Each
Part Number: YGA-55048
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Ring and Pinion, Chrysler 9.25 in., 3.92:1 Ratio, Standard Rotation, Set
Part Number: MGR-C9-25-392
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier, Air Locker, Nodular Iron, 30-spline, Dana 44, Kit
Part Number: ARB-RD117
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bearing, Pinion, 1.625 in. Inside Diameter, Each
Part Number: TMK-M802048
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential, Eaton Detroit Truetrac, 30-Spline, Dana 44, Each
Part Number: ETN-913A591
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bearing, Pinion, 1.312 in. Inside Diameter, Each
Part Number: TMK-M88048
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Cover, Hardcore, Nodular Iron, Black Powdercoated, Dana 44, Each
Part Number: YGA-29101
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Cover, Nodular Iron, Dana 60, Gray, Kit
Part Number: SDH-10024090
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Gear, Ring and Pinion, 4.88:1 Ratio, Dana 60, Set
Part Number: RMG-79-0068-1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Gear, Ring and Pinion, 4.56:1 Ratio, Dana 60, Set
Part Number: RMG-79-0077-1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier, Dura Grip Positraction, Clutch-type, 30-Spline, 3.92 and Numerically Higher Gear Ratios, Dana 44 Rear/IFS, Various, Each
Part Number: YGA-26027
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential, Lock-Right, Locker, 30-Spline, Dana 44, Open, Each
Part Number: PWT-2410-LR
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Ring and Pinion Gears, 4.10:1 Ratio, 29-spline, Standard Rotation, Dana 60, Set
Part Number: SDH-76047X
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Gear, Ring and Pinion, 3.55:1 Ratio, Chrysler, 9.25 in., Set
Part Number: MGR-C9-25-355
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Grizzly Locker, Dana 44, 30 Spline, 3.92 Up Ratio, Each
Part Number: YGA-28001
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Grizzly Locker, Dana 60, 35 Spline, 4.56 Up Ratio, Each
Part Number: YGA-28005
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier Cases, Dana 44, 30 Spline, 3.92 and Up Ratio, Each
Part Number: YGA-20028
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Gear, Ring and Pinion, 3.73:1 Ratio, Dana 44, Set
Part Number: MGR-D44-373
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Gear, Ring and Pinion, 3.54:1 Ratio, Dana 44, Set
Part Number: MGR-D44-354
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier, Clutch-type, Steel, Dana 60, 30-Spline, 4.10 and lower ratio, Each
Part Number: SDH-708013
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster