Availability
Shifter, 1968-76 C3 Corvette, Slap-Shift, 3 or 4-Spd Auto Shifter Package, TH350, TH400, 200-4R, THM700-R4, 4L60E, 4L65E, 4L70E, 4L75E, 4L80E, 4L85E
Part Number: SIW-SW270-C3AR
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifter Cover, Aluminum, Natural, Quarter Stick, Each
Part Number: HUU-1300041
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Replacement Shifter Stick, Steel, Chrome, 7.50 in. Long, 3/8 in.-16 Thread, Each
Part Number: HUU-5387238
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Winters Sidewinder, Forward Pattern Valve Body, Standard Gate, Ford, Lincoln, Mercury, C-4, Each
Part Number: WPP-357-1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifter Solenoid, Electric, B&M Pro Bandit, GM, Powerglide, Steel, Gold dichromate, Kit
Part Number: CTN-SN5200
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifters, Automatic Transmission Floor Mount Shifters, Cable, Detent, Knob, 4-speed Shifter Conversion, Green Letters, Chevrolet, 4L80E, Kit
Part Number: SIW-SW1023
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifter Cable, Super Duty, 10 ft. Length, Morse Style, Eyelet/Threaded Ends, Red, Each
Part Number: BMM-80835
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Manual Shifter, Competition, Plus, Chrome Handle, Tremec 3650, Ford, Each
Part Number: HUU-3910201
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Electronic Sport Shifters, Detent, 4.000 in. Straight Chrome Stick, 3/8-24 in., Black Mushroom Knob, 6R80E, Each
Part Number: LOK-ES6R80HMB
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
1969 Camaro, Nova, Neutral Safety Switch, With Manual Transmission, Restoration, Chevrolet, Replaces GM # 1993494, Each
Part Number: SUM-RP20502
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Cheetah SCS, Ford, Lincoln, Mercury, C-4/C-6, Each
Part Number: TAC-70013
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shift Indicator, Restoration, 1979-1983 Chevy/GMC Truck, OEM Replacement, Assembly, GM Truck, Replaces OEM part 25023575, Each
Part Number: SUM-RP22467
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Manual Shifter, Mastershift, Chevy, Ford, GMC, Pickup, SUV, Each
Part Number: HUU-3666809
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Replacement Shifter Stick, Steel, Chrome, 8.60 in. Long, 3/8 in.-16 Thread, Each
Part Number: HUU-5388550
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Gated, Floor Mount, Linkage Operated, Detent, GM, 700R4/200-R4/4L60/4L60E, 10 in. Stick Length, Billet Knob, Each
Part Number: SUM-700064L
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifter, Manual Transmission, Black Anodized finish, Dodge, Each
Part Number: BAA-BC-0914-2
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, GM, 700R4, 16 in. Double Bend Chrome Stick, Black Anodized Mushroom Knob, Each
Part Number: LOK-CM700BNMB
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Shut-Off CO2 Includes Fittings
Part Number: DED-ABR
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Winters Sidewinder, Reverse Pattern Valve Body, Drag Race Reverse Gate, Chrysler, Torqueflite 727, Each
Part Number: WPP-207-2
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Pistol-Grip Quarter Stick, Chrysler, Dodge, Ford, Lincoln, Mercury, Plymouth, Each
Part Number: HUU-3162010
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Neutral Safety/Backup Switch, GM Column Shifter Linkage, Each
Part Number: SUM-700208
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Shifter Assembly, Horseshoe, Linkage Operated, Detent, Chevy, TH350, TH400, Forward, Each
Part Number: OER-3920267
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Automatic Shifter, Winters Sidewinder, Reverse Pattern Valve Body, Rock Crawler Reverse Gate, GM, TH400, Each
Part Number: WPP-107-2C
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Switch, Push Button, Momentary, Universal, Black Anodized, 15 Amps, Billet Aluminum, Linelock , Each
Part Number: SUM-890155-MBLL
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.