Filters
Yoke, Differentail, Replacement, Buick, Cadillac, Chevrolet, GMC, Isuzu, Oldsmobile, Pontiac, Saab, Each
Part Number: ADO-12479332
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, AOD, C-4, T-10, T-5 Transmission, Forged Steel, 28-Spline, Spicer 1310 Joint Style, 6.5 in. Length, Each
Part Number: SOX-T2-3-8251HP
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Billet Steel, 1350 U-joint, 27-spline, GM, Powerglide, Each
Part Number: FTI-F2521
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Driveshaft Pinion Yoke; Forged 1310 Pinion Yoke; Forged Steel For GM 12 Bolt Rear End; Accepts 1310 U-Joint A
Part Number: IED-PY12-1310
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Billet Carrier Bearing, Chevy, GMC, Each
Part Number: WST-BCB-6372
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Heavy Duty Transmission Slip Yoke, Ductile Iron, 1310, 27-spline, GM TH350, Each
Part Number: HUP-HP8801
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Driveshaft, Assembled, Steel, Each
Part Number: RNB-936-251
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Differential Pinion Yoke, 1310, U-Bolt Style, 26 Spline, Steel, Dana 30, Each
Part Number: YGA-41018
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Pinion yoke 9"Ford with 1350 U-Joint
Part Number: SOX-T9-28-1350FD
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Slip Yoke Assembly 1310 Series
Part Number: SDH-2-3-13461X
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Heavy Duty Transmission Slip Yoke, Ductile Iron, 1350, 27-spline, GM TH350, Powerglide, 700R4, Each
Part Number: HUP-HP8805
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
U-Joint, Lifetime, Spicer 1350/SPL30, Solid, Each
Part Number: SDH-SPL30-1350XC
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yokes, End Yokes, Spicer 1350, 26-spline Inner, Steel, 3.000 in. Overall Length, Front Differential or Rear Differential Position, Dana 44, Each
Part Number: SDH-3-4-5761-1X
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Steel, 1350, GM TH400/Doug Nash/Super T-10, 32-Spline, Each
Part Number: MSR-TY700
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Transmission Yoke, N3R Style, Forged Steel, 32 Spline, GM, Borg Warner, Doug Nash, Jerico, Richmond, Each
Part Number: IED-SY400-3R
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Transmission Yoke, 2-Piece, 27 Spline, GM, Powerglide, TH350, T-56, 4L60, 4L60E, Muncie, T-10, Each
Part Number: STR-U1677
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Replacement Driveshaft Yoke, Spicer 1330, 4.960 in. Flange Diameter, Each
Part Number: MOP-05015556AA
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Slip Yoke, 16-Spline Inner, Steel, 7.312 in. Overall Length, Spicer 1350 U-joint Style, Each
Part Number: SDH-3-3-2801KX
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yokes, Slip Yokes, Spicer 1410, 30/31-spline Inner, Steel, 8.340 in. Overall Length, 4.438 in. Outside Yoke Dimension, At Transmission Position, Each
Part Number: SDH-3-3-4391X
Estimated Ship Date: May 5, 2025 if ordered today
Estimated Ship Date: May 5, 2025 if ordered today
Yoke, S-Series Steel, 1350, Chrysler 8.75 in., 29-Spline, Each
Part Number: STR-U1608
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yokes, Slip Yokes, Spicer 1350, 31-spline Inner, Steel, 6.440 in. Overall Length, At Transmission Position, Tremec T56 Super Magnum, Tremec TKO, Each
Part Number: SDH-3-3-2491X
Need It Sooner?
We recommend these similar substitute parts:
Transmission Yoke, N3R Style, Forged Steel, 6.00 in., 27 Spline, GM, Each
Part Number: IED-N3R-3-6081X
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, Steel, 1350, Ford 9 in. Differential, 35-Spline, Each
Part Number: MSR-PY300
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Yoke, End Yoke, 1480, 29-Spline, Steel, Dana 60, Dana 70, Each
Part Number: SDH-3-4-13391-1X
Not Yet Reviewed
Estimated Ship Date: Jun 4, 2025 if ordered today
Estimated Ship Date: Jun 4, 2025 if ordered today
Yoke, S-Series Steel, 1350, Chrysler 8.75 in., 10-Spline, Each
Part Number: STR-U1607
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.