Availability
Transmission & Drivetrain
Yokes, Slip Yokes, Spicer 1310, 27/28-spline Inner, Steel, 6.500 in. Overall Length, 3.466 in. Outside Yoke Dimension, At Transmission Position, Each
Part Number: SDH-2-3-8251X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
1969 Camaro, Nova, Neutral Safety Switch, With Manual Transmission, Restoration, Chevrolet, Replaces GM # 1993494, Each
Part Number: SUM-RP20502
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Flywheel Ring Gear, 157-tooth, Steel, Ford, Mercury, Each
Part Number: PIO-FRG-157N
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Universal Joint, 1330/1350 Conversion Style, 1.063 in., Steel, Each
Part Number: SDH-5-648X
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
U-Joint Fasteners, Straps, S44/GM 3RL Style, Steel, 1.125 in. Bearing Cap O.D., Buick, Cadillac, Chevy, Kit
Part Number: SDH-2-70-48X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Wheel Hub and Bearing Assembly, Front, Ford, Each
Part Number: MOG-513115
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Direct Fit Axle Shafts, Direct Replacement, Rear, Right, Chrysler, Dodge, Each
Part Number: MOP-53010748AA
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Manual Transmission Bearing, Countershaft, Borg Warner T5, New Process 2500, New Process A535, or Tremec T5
Part Number: TMK-LM67048
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Automatic Transmission Filter, Chevy, GMC, Hummer, Allison 1000, Each
Part Number: ADO-TF950
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Locking Hubs, Manual, Black with Gray Dial, Toyota, Each
Part Number: ASN-FHT-019
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Flywheel, Steel, Chevy, GMC, 7.4L, Each
Part Number: LUK-LFW295
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Transmission Dipstick, Locking Replacement, Each
Part Number: PIO-768023
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Differential Carrier Clutches, Differential Clutch Disc and Plate Kits, Composite Clutch Pack, Rear, Traction Lock, Chrysler 9.25 in., Dana 44, Kit
Part Number: SDH-708203
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Yokes, Slip Yokes, Spicer 1350, 31/32-spline Inner, Steel, 6.938 in. Overall Length, 3.875 in. Outside Yoke Dimension, At Transmission Position, Each
Part Number: SDH-3-3-5571X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Differential Carrier, Open, Dana 30, Front, 3.73 & Up, Ford, Lincoln, Mercury, Jeep, Each
Part Number: SDH-706008X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Automatic Transmission Pan, Stock Style, Steel, Zinc Finish, AW4, Jeep, Each
Part Number: CWA-83504037
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Slip Yoke, 27-spline Inner, Steel, 5.469 in. Overall Length, Each
Part Number: SDH-2-3-6081X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
U-Joint, Light Duty, Spicer 1410 Style, Steel, 4 Plain Bearing Cap Style, Each
Part Number: SDH-5-160X
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Ring and Pinion Gears, 4.10:1 Ratio, 29-spline, Standard Rotation, Installation Kit, Dana 60, Kit
Part Number: SDH-708125-5
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Wheel Hub and Bearing Assembly, Front, Ford, 14mm x 1.5 Threads, Each
Part Number: TMK-SP580205
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Bearing Race, Pinion, 3.250 in. Diameter, Each
Part Number: TMK-M802011
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Automatic Transmission Rebuild Kit, Ford, Lincoln, Mercury, AOD, 31-Spline, Kit
Part Number: SUM-705011
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Universal Joint, 1480-WJ Style, Greasable, Steel, Each
Part Number: MOG-374
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Ring and Pinion Gear, Installation Kit, 7.17:1, Standard Rotation, Dana 60, Kit
Part Number: SDH-706033-8X
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Wheel Bearing and Hub Assembly, Steel, Natural, Cadillac, Chevy, GMC, Each
Part Number: ADO-515097
Not Yet Reviewed
Estimated Ship Date: Monday 2/9/2026
Estimated Ship Date: Monday 2/9/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster