Availability
Ridge Reamer, 2.688 in. - 5.313 in. Bore Adjustment Range, Tungsten Carbide Bit, Each
Part Number: LIL-36500
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Weather Station, 5100 Racing Meter, Hand-held, Includes Bluetooth® LINK, Each
Part Number: NKM-0851LRED
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Lifter Retaining Tool, Chevy LS, Gen III, IV, LT Gen V, Sold as a Pair
Part Number: POW-POW101046
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Ratchet, Nano, Flex Head, Chrome, 100-Tooth, Steel, 1/2 in. Drive, 18 in. Length, Each
Part Number: APT-78218
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Stand, 1,250 lbs. Weight Capacity, Steel, Black Painted, Engine Bag, Lift Plate, Kit
Part Number: SUM-CSUM8014
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Floor Jack, Formula Quick Lift Jack, Long Reach, 660 lbs. Capacity, Mechanical, 8.260 in. Maximum Lift, 25 lbs., Steel, Gray Powdercoated, Each
Part Number: BGR-BGR156P
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Power Station, Workbench, 2 LED Pivotable Lights, 1000 Lumens of 6000K daylight, 125V, Each
Part Number: SUM-917065
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Tool Bag, Nylon, Gray/Tan/Black, Each
Part Number: SUM-900082
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Spring Height Micrometer, 1.400 to 2.100 in. Range, Each
Part Number: BTC-BTRHM
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft Socket, 1/2 in., Steel, Buick, Ford, Pontiac, Each
Part Number: SUM-904798
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Tester Adapter, Cooling System, Steel, Green, Buick, Chevy, Ford, GMC, Each
Part Number: SNN-3127
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Storage Case, Horizontal, Replacement Top, Accepts Ford, 9 in. Differential, Plastic, Black, Each
Part Number: SUM-292009-1
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Jacks, 3 Ton Service Floor Jacks, Hydraulic, Aluminum, Black, 3.85 in. Minimum Height, 19.40 in. Maximum Lift Height, Each
Part Number: SXT-6603AJ
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Ignition Testers, LCD Display, Each
Part Number: MSD-89981
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Lift Plate. Fits Ford 7.3L Godzilla Gas Engines, Steel, Red, Each
Part Number: SUM-G1097
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Plastigage, Green Kit, 0.001 in.-0.003 in./.025mm-.076mm, Range, Each
Part Number: SUM-PG1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Storage Cabinet, Overhead, Diamond Plate Aluminum, Silver Diamond Tread Finish, 72 x 14 x 16 in. Size, Each
Part Number: PTM-903
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harness Tape, Black, 1.25 in. Width, 100 ft. Length, Each
Part Number: AWW-R0067108
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cable Crimper, 7.5-Ton, Hydraulic, Steel, Black/Yellow, Rubber Handle, Black, 8 Hardened Steel Die Sets, Kit
Part Number: TTN-11981
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Sander, Sanding Blocks, Set of 7
Part Number: DUK-TAI-AF44L
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft Socket, 1/2 in., Aluminum, Small Block Chevy, Pontiac, Each
Part Number: SUM-G1063
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Primer Socket, Aluminum, Natural, 3/8 in. Drive, Chevy, LS, Each
Part Number: SUM-900330
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Fender Cover, Microfiber Backing Material, Fleece Facing Material, Green, OEM Tools Logo, 24 in. Width, 42 in. Length, Each
Part Number: OES-24899
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Circuit Tester, Power Probe III Combo, Kit
Part Number: PWP-PP3LS01
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.