Availability
Flex Hone Tool, GBD Series, 4.250 in. to 4.500 in., 320 Grit, Silicone Carbide, Each
Part Number: BRH-GBD41232
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Installation, Puller Tool, LS Engines, Kit
Part Number: PRO-66518
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft Bearing Installation Tool, Chevy, Small Block, Kit
Part Number: AAF-ALL96470
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressors, Steel, Black, Cylinder Head On, Fits GM Gen V LT Cylinder Heads, Chevrolet, 5.3L, 6.2L, Each
Part Number: SUM-906789
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Compressor, Cylinder Head On, Chevy, LS3, LS9, L92, L99, Each
Part Number: TFS-90307
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Ring Filer, Pro Ring Filers, Red Candy Powdercoated, 120 Grit. 0-1.000 in. Dial Indicator Range, Steel, 120V, Each
Part Number: SUM-970005
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pro LS Timing Cover Installation Tool, Crankshaft Seal Position, Gen III-IV LS, Each
Part Number: SUM-900337
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tool, Harmonic Balancer Installer/Puller, LS-based Engines, Chevy, GMC, Pontiac, Each
Part Number: SME-K-906008
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Tester, Bench Mount, Each
Part Number: LSM-SM-1000
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Air Tool, Valve Spring Compressor, Each
Part Number: PRO-66849
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cylinder Leakage/Leakdown Tester, Two Gauges, 0-100 Leakage Range, 5% Increments, 0-100 psi Range
Part Number: LAG-CLT-2PB
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pushrod Length Checker, Adjustment Range 6.125 in. to 7.500 in., Ball Ends, Each
Part Number: TFS-9000
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Ring Filer, USA-1 Ring Filers, Blue Powdercoated, 0-1.000 in. Dial Indicator Range, Steel, Each
Part Number: SUM-970012
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Harmonic Balancer Puller, 3-Jaw Puller, 4 Forcing Rods, 1 Forcing Screw, Kit
Part Number: OTC-6667
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ring Compressor, Aluminum, Black Anodized, Adjustable, 3.900 in. to 4.050 in., Each
Part Number: SME-90A3900
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Block Torque Plates, Big Block Chevrolet, Torque Plate Engine Block Boring, Honing, 4.63 in. Bore, Each
Part Number: ICB-551300-BBC02
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pump Pickup Tube Retainer Brace, Billet Aluminum, Chevy Gen III/IV LS Engines, Kit
Part Number: SUM-402060
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tester Adapter, Cooling System, Steel, Green, Buick, Chevy, Ford, GMC, Each
Part Number: SNN-3127
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston, Rod, Rocker, Pushrod and Lifter organizer, Made in the USA steel, tab and slot deisgn.
Part Number: SUM-9004692
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Compression Tester, 10mm, 12mm, 14mm, 16mm Adapters, 0-300 psi Range, 10 psi Increments, 2 1/2 in. Gauge Diameter, Kit
Part Number: LAG-TU-30A
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Tester, Rimac Big Blue, 0-500 lbs./in. Range, Each
Part Number: PRO-BB0500
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft Degree Kit, 11 in. Wheel, Black, White Numbers, Dial Indicator, Case Included, Kit
Part Number: HPC-C9
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
LS Crankshaft Damper Drill Pinning Tool, LS1, LS3, LQ4, LSX, LT1, Kit
Part Number: ICB-551917
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Piston Ring Filer, Electric, 220 V, 2-Grinding Wheels, Each
Part Number: TSR-PRF-822DW
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.