Availability
Wrenches, Valve Lash, 5/8 in. Wrench with 3/16 in., 7/32 in. T-Handles, Stainless Steel, Kit
Part Number: PRO-66781
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Spark Plug Thread Repair Kits, Deep Hole, M14mm x 1.25, Four Insert Sizes, Tap, Holder, Swedger, Installer, Set Screw, Kit
Part Number: LIL-65200
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Engine Block-Off Plates, Vacuum Pump, GM, V8, Gen V, Kit.
Part Number: ICB-551123
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Cylinder Hone Tool, GB Flex-Hone, Brush Type, Silicone Carbide, 120 Grit, 3.750 in. to 4.125 in. Diameter, 13.50 in. Length
Part Number: BRH-GB41812
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Cam Degree Wheel, 11 Inch Wheel, Black Anodized, White Laser-Etched Markings, Valve Timing, TDC, BDC, Each
Part Number: TFS-90000-16W
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Valve Spring Tester, Combo, Analog, Mini, 0-600 lbs./in. Range, Measuring Tool, Each
Part Number: PRO-66841
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Pushrod Length Checker, Hi-Tech, Steel, Adjustment Range 5.800 in. to 6.800 in., Ball Ends, Each
Part Number: CCA-7701-1
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Valve Spring Height Micrometer, 1.800 to 2.200 in. Range, Steel, Natural, Each
Part Number: HRS-92161
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Combo, Summit®, Dual Gauge Leakdown Tester, Compression Tester, Automotive Stethoscope, Kit
Part Number: CMB-17-0006
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Wrenches, Valve Lash, 9/16 in.Wrench with 3/16 in., 7/32 in.T-Handles, Kit
Part Number: SUM-906780
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Ring Compressor, Aluminum, Red Anodized, 4.310 in. Bore, Each
Part Number: PRO-67574
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Top Dead Center Alert Whistle, Flexible, Compression Stroke, Rubber Hose, Black, Steel Adapter, Each
Part Number: MRG-8016MRG
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Squaring Tool, Piston Ring, 4.000 in. to 4.085 in. Bore Adjustment, Aluminum, Black Anodized, Each
Part Number: TSR-8910
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Harmonic Balancer Holding Tools, Steel, Black, Zinc Chromate Finish, Slotted, includes 3-16 in. Spacers, Universal, Each
Part Number: FLU-300020
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Camshaft Degree Kit, Heads Off, Chevy Big Block, Kit
Part Number: CCA-4935
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Deck Bridge, Dial Indicator Base, Aluminum, Blue, 4.750 in. Span, Each
Part Number: POW-POW101310
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Valve Guide Cutting Tool, Steel, Carbide Tipped, Cuts Guide .530 in. O.D., Each
Part Number: CCA-4726
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Torque Plate, Billet Aluminum, 4.200 in. Bore Diameter, 1.980 in. Thick, Mopar, Gen III Hemi, 5.7L, 6.1L, Each
Part Number: ICB-551300-M0P03
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Valve Spring Height Micrometer, 1.800 to 2.200 in. Range, Each
Part Number: SUM-9000323
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Crankshaft Socket, 1/2 in., Steel, Each
Part Number: CCA-4799
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Adjustable Pushrod Length Checker, Ball Tip, 8.800 in. to 9.800 in., Steel Alloy, Black Oxide, Each
Part Number: TFS-9503
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Piston Ring Compressors, Adjustable, 2 7/8 in. Min., 4 3/8 in. Max, Steel, Black, Kit
Part Number: PWB-940387
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Engine Rotation Adapter, Steel, Balancer Mount, 1/2 in. Drive, Chevy/Ford, V8, Each
Part Number: PRO-66782
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Timing Cover Installation Tool, Crankshaft Seal Position, Chevy, Each
Part Number: MRG-LSTC1
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Cylinder Head CC Kit, 100 cc Burette and Stand, Kit
Part Number: PRO-66831
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.