Availability
3D Welding Table, 47" x 47" Heavy Duty 3D Steel WeldingTable with 5 Fixturing Surfaces
Part Number: BAI-1010425
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Lathe, 220V Single Phase Lathe, 12" Swing. 36" Length
Part Number: BAI-1016616
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Metal Downdraft Table, 230V 3Ø Metal Downdraft Table 80x52, Air Pulse Clean w/ HEPA Filter (Side Walls and Work Light Inc.)
Part Number: BAI-1017590
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Power Feeder, 220-Volt, 1/2 hp, Adjustable Speed, Cabinet Style, Each
Part Number: BAI-1017831
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Power Hammer, 220V 1Ph Power Hammer. 16 Gauge Mild Steel Capacity. 28" Throat Depth
Part Number: BAI-1021656
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Louver Press, 7 Ton Louver Press, 48" Throat Depth, 110V, Includes 3" Louver
Part Number: BAI-1022800
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
PL-1022VS-V2; 110V Variable Speed Bench Top Lathe, 10" Swing, 22" Bed Length
Part Number: BAI-1228215
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
BSV-12VS-V2; 120V Vertical Band Saw 12" Throat Depth, 1HP
Part Number: BAI-1230387
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Universal Bender, Manually Operated Universal Bender for Shapeing Steel, Iron, Brass, Copper and Aluminum.
Part Number: BAI-1005648
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Reversible Box/Pan Brake, Manually Operated Reversible Box and Pan Brake, 50" Length, 16 Gauge Mild Steel Capacity
Part Number: BAI-1010428
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Welding Rotator, 220V 3Phase Welding Rotator, 6 Ton Capacity, 10"-90" Ø
Part Number: BAI-1017699
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Welding Rotator, 220V 3Phase Welding Rotator, 22 Ton Capacity, 20"-138" Ø
Part Number: BAI-1017701
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
IGB-8; 8" Industrial Bench Top Grinder, 110V Includes LED Work Light and Wheel Dresser
Part Number: BAI-1227895
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
S90-1000-50, 10 T 50' Lift
Part Number: JPW-101968
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
1/2SS-3C-30 1/2T Electric Hoist 30' LIFT 3PH
Part Number: JPW-123300
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
1SS-3C-40 1T Electric Hoist 40' LIFT 3PH
Part Number: JPW-134000
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
1SS-3C-60 1T Electric Hoist 60' LIFT 3PH
Part Number: JPW-136000
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
TS200-230-015,2-Ton Two Speed Electric Chain Hoist 3-Phase 15' Lift, MT200 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 11ft
Part Number: JPW-140094K
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
TS200-230-040 2T Electric Hoist 40' LFT 3PH
Part Number: JPW-140097
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
TS300-230-020,3-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT300 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-140118K
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
TS500-230-010,5-Ton Two Speed Electric Chain Hoist 3-Phase 10' Lift
Part Number: JPW-140127
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Milling Machine, JVM-836-3 Mill With 3-Axis ACU-RITE 203 DRO (Knee) With X and Y-Axis Powerfeeds
Part Number: JPW-690047
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Milling Machine, JVM-836-3 Mill With ACU-RITE 203 DRO With X-Axis Powerfeed
Part Number: JPW-690146
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Milling Machine, JTM-1 Mill With ACU-RITE 203 DRO
Part Number: JPW-690244
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Milling Machine, JTM-1050VS2 Mill With 3-Axis ACU-RITE 203 DRO (Knee) With X and Y-Axis Powerfeeds
Part Number: JPW-690256
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.