Availability
Lathe, E-1340VS With ACU-RITE 303 DRO With Taper Attachment and Collet Closer
Part Number: JPW-892414
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With Taper Attachment
Part Number: JPW-892450
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With Collet Closer
Part Number: JPW-892451
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With Taper Attachment and Collet Closer
Part Number: JPW-892452
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With ACU-RITE 303 DRO With Taper Attachment
Part Number: JPW-892462
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With ACU-RITE 303 DRO With Collet Closer
Part Number: JPW-892463
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With ACU-RITE 303 DRO With Taper Attachment and Collet Closer
Part Number: JPW-892464
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
Lathe, E-1440VS With Newall DP700 DRO
Part Number: JPW-892469
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
25 Ton Dual Station and Portable Power Unit 1 Phase, 230 Volt
Part Number: EDW-HAT2510
Not Yet Reviewed
Estimated Ship Date: Oct 31, 2025 if ordered today
Estimated Ship Date: Oct 31, 2025 if ordered today
25 Ton Dual Station and Portable Power Unit 3 Phase, 230 Volt
Part Number: EDW-HAT2520
Not Yet Reviewed
Estimated Ship Date: Oct 31, 2025 if ordered today
Estimated Ship Date: Oct 31, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 208 V, 3 Phase with PowerLink System, Each
Part Number: EDW-IW55-3P208
Not Yet Reviewed
Estimated Ship Date: Oct 31, 2025 if ordered today
Estimated Ship Date: Oct 31, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 460 V, 3 Phase with PowerLink System, Each
Part Number: EDW-IW55-3P460
Not Yet Reviewed
Estimated Ship Date: Oct 31, 2025 if ordered today
Estimated Ship Date: Oct 31, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 230 V, 1 Phase with PowerLink System, Includes Coper Notcher, Kit
Part Number: EDW-55231512
Not Yet Reviewed
Estimated Ship Date: Oct 31, 2025 if ordered today
Estimated Ship Date: Oct 31, 2025 if ordered today
Tapping Machine, Single Arm Air Powered Tapping Machine, 1/8"-1" Tapping Capacity:39" Max Range *Does not fit cart*
Part Number: BAI-1000326
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Tapping Machine, Double Arm Articulated Air Powered Tapping Machine, 1/8" to 1" Tapping Capacity, 74" Max Work Range
Part Number: BAI-1000327
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Bending Brake, Box and Pan, HD BB-9612, Steel Frame, 22 Assorted Fingers. 8 ft. Length, 12-ga. Mild Steel/16-ga. Stainless, 135-degree Max Bend, Each
Part Number: BAI-1000553
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Variable Belt Grinder, 110 Volt Three Wheel Variable Speed Belt Grinder. 2" Belt Width. 60" Belt Length.
Part Number: BAI-1000670
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Band Saw, Dual Mitering, 220V 3 Ph 13 in. Manual, Each
Part Number: BAI-1001292
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Band Saws, BS-250M, Metal Cutting, 120 V, High-torque 2 hp Motor, Manual Return, Swivel Head, 0 to 60-degree Miter Angle, 1 in. Blade Width, Each
Part Number: BAI-1001396
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Metal Cutting Band Saw, 220 Volt Single Phase, Metal Cutting Band Saw. Mitering Vice. 1 in. Blade Width, Each
Part Number: BAI-1001740
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Cold Saw, 220V 3Phase Heavy Duty Semi-Automatic Cold Saw. 11" Blade Diameter.
Part Number: BAI-1002447
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Drill Press, 220 Volt Three Phase Gear Driven Drill Press. Power Feed. 1-1/2" Mild Steel Drilling Capacity.
Part Number: BAI-1002872
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Hydraulic Plate Roll, 220 Volt Three Phase Hydraulic Plate Roll. 5' Length 10 Gauge Mild Steel Capacity.
Part Number: BAI-1006533
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Plasma Cutter, 220 V, Single Phase, Each
Part Number: BAI-1006725
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Shears, 220 Volt Three Phase Hydraulic Powered Shear, 80.00 in. Length, 10 Gauge Mild Steel Capacity, Each
Part Number: BAI-1007197
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.