Availability
Depth Bead Roller, Sheet Metal, 16-Gauge Capacity, Throat Depth 36 in., Includes Dies, Each
Part Number: BAI-1000862
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Band Saw, Dual Mitering, 220V 3 Ph 13 in. Manual, Each
Part Number: BAI-1001292
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Band Saws, BS-350SA, Metal Cutting, 220 V Single-phase, High-torque 2 hp Motor, Semi-auto, Dual Swivel Head, Degrees: 0-60 Right; 0-45 Left, Each
Part Number: BAI-1001570
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Metal Cutting Band Saw, 220 Volt Single Phase, Metal Cutting Band Saw. Mitering Vice. 1 in. Blade Width, Each
Part Number: BAI-1001740
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
44Ton Ironworker, 220V 1Phase 44 Ton 4 Station Ironworker
Part Number: BAI-1007756
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Shop Press, 5 Station Ironworker, 50 Ton, 220V 1 Phase, Each
Part Number: BAI-1007789
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Pipe and Metal Bender, Portable Power Unit, 3-Phase, 230 Volt, Dies Not Included, Each
Part Number: EDW-HAT002
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
10 Ton Bender and Portable Power Unit 3 Phase, 230 Volt
Part Number: EDW-HAT1020
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 20-Ton Shop Press, Electric/Hydraulic, Steel, Black, Includes Portable Power Unit 3 Phase, 230 Volt, Each
Part Number: EDW-HAT2020
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
25 Ton Dual Station
Part Number: EDW-HAT2500
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
25 Ton Dual Station and Portable Power Unit 1 Phase, 230 Volt
Part Number: EDW-HAT2510
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
25 Ton Dual Station and Portable Power Unit 3 Phase, 230 Volt
Part Number: EDW-HAT2520
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press, Electric/Hydraulic, Steel, Black, Each
Part Number: EDW-HAT8000
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press, Electric/Hydraulic, Steel, Black, Includes Portable Power Unit 3 Phase, 230 Volt, Each
Part Number: EDW-HAT8020
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press, Electric/Hydraulic, Steel, Black, Includes Portable Power Unit 3 Phase, 460 Volt, Each
Part Number: EDW-HAT8030
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press with PLC, Electric/Hydraulic, Steel, Black, Each
Part Number: EDW-HAT8050
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press with PLC, Electric/Hydraulic, Steel, Black, Includes Portable Power Unit 3 Phase, 230 Volt, Each
Part Number: EDW-HAT8070
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Shop Press, 60-Ton Shop Press with PLC, Electric/Hydraulic, Steel, Black, Includes Portable Power Unit 3 Phase, 460 Volt, Each
Part Number: EDW-HAT8080
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 208 V, 3 Phase with PowerLink System, Each
Part Number: EDW-IW55-3P208
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 230 V, 3 Phase with PowerLink System, Includes Coper Notcher, Kit
Part Number: EDW-55233522
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Cutting Shear, 55-Ton, Ironworker, Metal, 0.875 in. Cutting Thickness, 230 V, 3 Phase with PowerLink System, Includes 10 in. Brake, Kit
Part Number: EDW-55233512
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Vertical Milling Machine, 220V 1Phase Variable Speed Vertical Milling Machine. 9" x 49" Table. Yaskawa VFD
Part Number: BAI-1008232
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Milling Machine, 220V 3 Phase, Variable Speed, Vertical Milling, 9.00 in. x 49.00 in. Table, 16.00 in. Spindle to Table Height, Each
Part Number: BAI-1008236
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Welding Positioner, 110V 19.5" Welding Positioner, 1100 lbs Capacity and 90 degrees
Part Number: BAI-1008392
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Mechanical Radial Drill, 220 Volt Three Phase Mechanical Radial Drill, MT4 Spindle, Includes Quick and Tappinig Chuck
Part Number: BAI-1008487
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.