Availability
20" Gear Head Drill Press 230V, 3Ph
Part Number: JPW-354020
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
JDP-20VS-3, 1-1/2 Drilling Capacity, 2HP, 3 230/460V 3Ph
Part Number: JPW-354231
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Planer, 230/460 V, 15 HP, 3.375 in. Cutting Diameter, 32.188 in. Length, 26.000 in. Width, 1,725 lbs., Each
Part Number: PMC-1791303
Not Yet Reviewed
Estimated Ship Date: Nov 4, 2025 if ordered today
Estimated Ship Date: Nov 4, 2025 if ordered today
JDP-20VST , Variable Speed with Tapping 1-1/2 Drilling Capacity, 2HP, 230V, 3Ph
Part Number: JPW-354240
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
2HP, 460V with 3Ph Power Down Feed JDP-20EVST-460-PDF
Part Number: JPW-354246
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
PL-1022VS-V2; 110V Variable Speed Bench Top Lathe, 10" Swing, 22" Bed Length
Part Number: BAI-1228215
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
BSV-12VS-V2; 120V Vertical Band Saw 12" Throat Depth, 1HP
Part Number: BAI-1230387
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Combination Disc/Drum Brake Lathe, RL-8500, Each
Part Number: RNR-5150066
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Combination Disc/Drum Brake Lathe, Heavy-Duty, RL-8500XLT, Each
Part Number: RNR-5150080
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2025 if ordered today
Estimated Ship Date: Nov 18, 2025 if ordered today
Vertical Mill, 110V Vertical Mill, 8" x 36" Table, 8 Speed Includes R8 Spindle, Coolant, Lubricator, Work Light
Part Number: BAI-1020694
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Metal Band Saw, 220V 3 Phase Vertical Tilting Band Saw with Pnuematic Operation
Part Number: BAI-1226643
Not Yet Reviewed
Estimated Ship Date: Oct 30, 2025 if ordered today
Estimated Ship Date: Oct 30, 2025 if ordered today
Combination Disc/Drum Brake Lathe, Heavy-Duty, RL-8500XLT, Each
Part Number: BPI-5150080
Not Yet Reviewed
Estimated Ship Date: Nov 12, 2025 if ordered today
Estimated Ship Date: Nov 12, 2025 if ordered today
350mm Manual Cold Saw Ferrous 230V
Part Number: JPW-414214K
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Lathe, Wood Lathe, 24.000 in. Turning Diameter, 42.000 Center to Center Distance, 230 V, Each
Part Number: PMC-1794224K
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
JMD-18PFN Mill/Drill With ACU-RITE 203 DRO and X-Axis Table Powerfeed
Part Number: JPW-350120
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Geared Head Drill Press with Power Downfeed, 2HP, 3Ph, 230V JDP20EVST-230-PDF
Part Number: JPW-354245
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
The JET JDPE-20EVS-PDF 1-1/4" Drilling Capacity, 2HP, 115V, 1Ph Electronic Variable Speed Drill with Power Downfeed
Part Number: JPW-354250
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
The JET JDPE-20EVSC-PDF 1-1/4" Drilling Capacity, 2HP, 115V, 1Ph Electronic Variable Speed Drill with Clutch Speed Change system and Power Downfeed
Part Number: JPW-354251
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.