Availability
Milling Machine, JTM-1050EVS2/230 Mill With 3-Axis Newall DP700 DRO (Knee) With X and Y-Axis Powerfeeds and Air Powered Draw Bar
Part Number: JPW-690642
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, JTM-1050EVS2/230 Mill With 3-Axis Newall DP700 DRO (Knee) With X, Y and Z-Axis Powerfeeds
Part Number: JPW-690643
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, JTM-1050EVS2/230 Mill With 3-Axis Newall DP700 DRO (Quill) With X, Y and Z-Axis Powerfeeds
Part Number: JPW-690648
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, JTM-4VS-1 Mill With 3-Axis ACU-RITE G-2 MILLPWR CNC
Part Number: JPW-690950
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, JTM-1050VS2 Mill With Newall DP700 3-Axis (Knee) DRO and X-Axis Powerfeed
Part Number: JPW-691236
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, JTM-4VS-1 Mill With 3-Axis ACU-RITE 203 DRO (Knee) With X-Axis Powerfeed
Part Number: JPW-691411
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, ETM-949 Mill with 3-Axis ACU-RITE 203 (Knee) DRO and X-Axis JET Powerfeed
Part Number: JPW-894124
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, ETM-949 Mill with 3-Axis ACU-RITE 203 (Knee) DRO and X, Y-Axis JET Powerfeeds
Part Number: JPW-894126
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, ETM-949 Mill with 3-Axis ACU-RITE 203 (Knee) DRO and X, Y, Z-Axis JET Powerfeeds
Part Number: JPW-894128
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Tool Chests, HXL Pro Series, Blue Powdercoated, 39,665 cu. in. Volume, Each
Part Number: HMS-HX04072172
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Tool Chests, HXL Pro Series, Red Powdercoated, 39,665 cu. in. Volume, Each
Part Number: HMS-HX04072173
Not Yet Reviewed
Estimated Ship Date: Dec 15, 2025 if ordered today
Estimated Ship Date: Dec 15, 2025 if ordered today
20" Gear Head Drill Press 230V, 3Ph
Part Number: JPW-354020
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Pipe and Metal Benders, Pipe Bender, Programmable, RDB-325, 220 V Single-phase, Hydraulic, Rotary Draw, Touchscreen, Foot Pedal Controls, Each
Part Number: BAI-1006814
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
BSV-18VS-220-V2; 220V Single Phase Vertical Band Saw 18" Throat Depth, 1HP
Part Number: BAI-1230401
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
PM2700 SHAPER, 3HP 1PH 230V
Part Number: PMC-1280100C
Not Yet Reviewed
Estimated Ship Date: Nov 11, 2025 if ordered today
Estimated Ship Date: Nov 11, 2025 if ordered today
Bandsaw, 24 in., Cast Iron, 5 hp, Each
Part Number: PMC-1791260B
Not Yet Reviewed
Estimated Ship Date: Nov 11, 2025 if ordered today
Estimated Ship Date: Nov 11, 2025 if ordered today
209HH PLNR, 5HP 3PH 230/460V
Part Number: PMC-1791316
Not Yet Reviewed
Estimated Ship Date: Nov 11, 2025 if ordered today
Estimated Ship Date: Nov 11, 2025 if ordered today
1Ph, 20' Lift, 115/230V
Part Number: JPW-212000
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
JDP-20VS-1 1-1/4 Drilling Capacity, 2HP, 115/230V, 1Ph
Part Number: JPW-354230
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
The JET JDPE-20EVSC-PDF 1-1/4" Drilling Capacity, 2HP, 115V, 1Ph Electronic Variable Speed Drill with Clutch Speed Change system and Power Downfeed
Part Number: JPW-354251
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Milling Machine, EVS-949 Mill with X, Y, Z-Axis JET Powerfeeds and USA Made Air Draw Bar
Part Number: JPW-894308
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Band Saws, BS-250M, Metal Cutting, 120 V, High-torque 2 hp Motor, Manual Return, Swivel Head, 0 to 60-degree Miter Angle, 1 in. Blade Width, Each
Part Number: BAI-1001396
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Band Saws, BS-350M, Metal Cutting, 220 V Single-phase, High-torque 2 hp Motor, Manual Return, Dual Swivel Head, Degrees: 0-60 Right; 0-45 Left, Each
Part Number: BAI-1001557
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Drill Press, 220 Volt Three Phase Gear Driven Drill Press. Power Feed. 1-1/2" Mild Steel Drilling Capacity.
Part Number: BAI-1002872
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Drill Press, 220V 1 Phase Variable Speed (VFD) Drill Press. Manual Feed. 1-1/16" Mild Steel (1-1/4" Cast Iron).
Part Number: BAI-1020169
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.