Availability
1955 Ignitions & Electrical
Wires, 8MM Triumph Type#2 (Red)
Part Number: PNX-804414
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Spark Plug, Copper Plus, 14mm, Gasket Seat, .375 in. Reach, Projected Tip, Resistor, RJ12C, Each
Part Number: CPN-592
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Wiring Pigtail, Headlight Connector, Jeep, H4, H6054, 6014, H6014, H6024, Each
Part Number: CWA-998475HT
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Ignitor® Solid State Ignition System, Hall Effect, 12 V, Positive Ground, Lucas Distributor, Kit
Part Number: PNX-LU-168LSP12
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Distributor Cap, Stock, Aluminum, Thermoplastic, Black, Edsel, Ford, Mercury, Each
Part Number: SMP-FD124T
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Ignition Combo, Pro-Billet HEI Distributor, Super Conductor Wires, Chevy Crate Engines, Kit
Part Number: MSD-84742
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Ignition Condenser, OEM Replacement, AMC, Jeep, Chrysler, Dodge, Plymouth, Studebaker, Each
Part Number: SMP-AL118
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Spark Plug Wires, Black Wire, Black Boots, Four Cylinder, Set
Part Number: SMP-23400
Estimated Ship Date: Today
Estimated Ship Date: Today
Battery Tray, One Battery Capacity, Steel, Black, E-coated, Chevrolet, Each
Part Number: GMK-4040-300-55S
Not Yet Reviewed
Estimated Ship Date: Sep 9, 2026 if ordered today
Estimated Ship Date: Sep 9, 2026 if ordered today
Intake Manifold Heater Relay, CJ, Scrambler, Willys, Kit
Part Number: PRF-30717
Estimated Ship Date: Today
Estimated Ship Date: Today
Estimated Ship Date: Apr 27, 2026 if ordered today
Conversion Kit, External Coil Kit for GM HEI, Coil not Included, Kit
Part Number: FST-730-0590
Estimated Ship Date: Jun 15, 2026 if ordered today
Estimated Ship Date: Jun 15, 2026 if ordered today
Spark Plug WIres, Ultra, Chevy SB, Under Header, 90 Degree Plug Boots, Non-HEI, Red, Set
Part Number: MOR-52029
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Spark Plug WIres, Ultra, Chevy SB, Under Header, 135 Degree Plug Boots, HEI, Black, Set
Part Number: MOR-51030
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
55-59 "CLASSIC UPDATE" WIRING SYSTEM
Part Number: HCT-UWH5559
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Headlight Bucket Extension Harness, 1955-57 Corvette, Set of 2, V/8,12 Volt. Pair
Part Number: SUM-RP22909
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Wire Connector, Reverse Lights, Ford, Tremec TKO, TKX, Each
Part Number: IST-ELA-19882
Not Yet Reviewed
Estimated Ship Date: May 14, 2026 if ordered today
Estimated Ship Date: May 14, 2026 if ordered today
Distributor Hold-Down Clamp, Steel, Chrome, Chevy, Each
Part Number: SPE-5760
Estimated Ship Date: Today
Estimated Ship Date: Today
Dist Drive, SB Chev Raised Cam w/ MSD Pro-Cap
Part Number: JES-KDD-44430
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Distributor Hold-Down Clamps, Zinc Alloy, Copper Plated Finish, Chevy, Each
Part Number: SUM-400510COP
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Battery Hold Down, Battery Hold Down - 47-55 Chevy GMC Truck ('55 1st Series)
Part Number: AMD-X341-4047
Not Yet Reviewed
Estimated Ship Date: Jun 1, 2026 if ordered today
Estimated Ship Date: Jun 1, 2026 if ordered today
Spark Plug Wire Sets, ThunderVolt 8.2mm, Assembled, Spiral Core, Black Wire, 8.20mm Diameter, Chevrolet, Small Block, Set
Part Number: TAY-86070
Not Yet Reviewed
Estimated Ship Date: Apr 29, 2026 if ordered today
Estimated Ship Date: Apr 29, 2026 if ordered today
Spark Plug Wires, Go-Spark, Pre-Made, Ceramic, Black, 8mm, Spiral Core, 90 Degree Boots, Over Valve Cover, Under Header, HEI, Chevy, Small Block, Set
Part Number: FIF-90012
Not Yet Reviewed
Estimated Ship Date: Jun 9, 2026 if ordered today
Estimated Ship Date: Jun 9, 2026 if ordered today
Spark Plug Wires, 8.5mm, Silicone, Black, 90 Degree Boots, Chevy, GMC, Buick, Oldsmobile, Pontiac, Small Block, Set
Part Number: EW1-16421BK
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Spark Plug Wires, Black Wire, Black Boots, Set
Part Number: SMP-28613
Estimated Ship Date: Today
Estimated Ship Date: Today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster