Availability
Driving Performance Meter, 7 in. Display, GPS, Camera, Kit
Part Number: GMN-010-02345-00
Cannot be shipped Internationally
Cannot be shipped Internationally
Data Acquisition, MyChron6 2T, Lap Timer, Backlit, 8 Colors, Karting, with M10 Water Temperature Sensor, 5.0mm Exhaust Gas Temp Sensor, Kit
Part Number: AAG-S0109
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Power Grid O2 Module, Wideband Oxygen Sensor, MSD Power Grid, NTK, Each
Part Number: MSD-7766
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition Components, Pressure Sensor, Oil or Fuel Pressure, 0-150 psi, 4 Pin, 1/8 NPT, Each
Part Number: AAG-S0048
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Boost Control Fitting Assortment Kit, 2 MAC Valve Solenoids, 1/4 in. Nylon Hose, 30 ft., 1/8 in. NPT Fittings, Kit
Part Number: LDM-PLK00002
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, V-Net Cable, Tee Connector, 9.000 in. Long, Each
Part Number: RPK-280CAVMT009
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition Components, SmartWire Kits, 8 Channel, Drag Race/Junior Drag Race/Kart, Kit
Part Number: RPK-S0041
Not Yet Reviewed
Estimated Ship Date: Jan 12, 2026 if ordered today
Estimated Ship Date: Jan 12, 2026 if ordered today
Data Acquisition, Split Collar and Magnet Assemblies, 8 Magnet Collar, 2.187 in. Inside Diameter, Each
Part Number: RPK-800CL8M2187
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, Racepak, Four Channel Wideband Controller, Right Cylinder Bank, Each
Part Number: RPK-220VMAF42468
Not Yet Reviewed
Estimated Ship Date: Jan 14, 2026 if ordered today
Estimated Ship Date: Jan 14, 2026 if ordered today
Fitting Assortment Kit, 1/4 in. Nylon Hose, 30 ft., 1/8 in. NPT Fittings, Kit
Part Number: LDM-PLK00001
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Gauge Sending Unit, 899 Series Oil Filled Pressure Sensor, Electrical, Thread-In, 1/8 in. NPT, 0-150 PSI, Stainless Steel, Each
Part Number: LDM-8990150
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Sensor, Liquid Temperature, 0-300 degrees F, Each
Part Number: RPK-810-TR-300
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, Racepak, V-Net Module with Sensor, Fuel Pressure, 0-75 PSI, Each
Part Number: RPK-220VPPTPP075
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition Component, 22-Channel CAN Sensor, Each
Part Number: AVM-30-2212
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, Racepak, Pressure Transducer Sensor, Powered, 0-150 PSI, Each
Part Number: RPK-810PT0150GVT
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquistion Wiring Harnesses, Holley EFI, I/O Adapter and Unterminated Vehicle Harness, for 7 in. Digital Dash, USB Memory Stick Included, Kit
Part Number: HLY-558-433
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
EGT-4 CAN W/ 2 UNITS, 2 HARNESS & 8 SENSORS
Part Number: FCH-5022007368V8
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition Components, Front Shock Travel Sensor, 13 in. Collapsed, 21 in. Extended, Each
Part Number: LDM-STS23800
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, EGT Plus, Clamp-on Style, Dual Probes, Kit
Part Number: CPK-4105-2
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition Components, Pressure Sensor, Fuel/Oil, 0-2000 psi., 1/8 NPT, 4 Pin Binder 719 Male Connector, 400mm Cable Length, Each
Part Number: AAG-S0050
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, V-Net Cable, Tee Connector, 36.000 in. Long, Each
Part Number: RPK-280CAVMT036
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Acquisition, Racepak, Four Channel Wideband Controller, Left Cylinder Bank, Each
Part Number: RPK-220VMAF41357
Not Yet Reviewed
Estimated Ship Date: Jan 14, 2026 if ordered today
Estimated Ship Date: Jan 14, 2026 if ordered today
Gauge Wire Harnesses, Holley EFI, Replacement, Pro Dash Service Harness, Plug-and-Play, for 553-111, 553-112, Each
Part Number: HLY-558-446
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Data Logging Unit, Digital Dash Recorder, Aluminum, Black, 47 Channels, Kit
Part Number: RPK-250-DS-IQ3D
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.